Blackpool - Manchester Electrification

Status
Not open for further replies.

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
I've been made aware that the bridge works at Grimford Lane have been put on hold and Network Rail will be re opening that road shortly, they have decided to do that particular bridge later in the year, this is due to the traffic situation which was monitored over this weekend from Friday, it does make sense as the impact on the local area has just been to much to handle, a sensible decision has been made.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
I've been made aware that the bridge works at Grimford Lane have been put on hold and Network Rail will be re opening that road shortly, they have decided to do that particular bridge later in the year, this is due to the traffic situation which was monitored over this weekend from Friday, it does make sense as the impact on the local area has just been to much to handle, a sensible decision has been made.

Wow! Paul and I visited the site today and Orangemen said it will be coming down this weekend, so your info must be very hot off the press.

To reinstate the bridge for road traffic will require reinstating the road surface.
--- old post above --- --- new post below ---
On a pass today I counted 88+/- concrete bases on each side between Lostock and Adlington.
The splits between stations (Lostock/Horwich/Blackrod/Adlington) were 34/18/33.
The gaps in the base runs are mainly through cuttings, which might need piles.

It's a 5-mile (8km) stretch. At 15 structures per km that's 120 structures.
So overall it looks like the bases are 73% complete on this stretch.
As a proportion of the whole Windsor Bridge-Euxton Jn 38km it is 13%.

The bases run out at about MP18 and there are preparations further north up to about the Huyton Viaduct/L&L Canal.
No sign of base work north of Adlington or south of Lostock, although there is plenty of bridge work going on.
Nothing new around Salford Crescent.

Is this deja vu, or have I seen its like before?

Paul Gaskell and I did a rail jaunt Lostock to Preston and back today, knocking the rust off our mast/base/scrape counting skills.

Are you sure your 34/18/33=88 tally is for BOTH sides, as that figure is as near as dammit what we found for the western side, with a further 30/15/24 on the eastern side

Photos later.

Dave and Paul
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Are you sure your 34/18/33=88 tally is for BOTH sides, as that figure is as near as dammit what we found for the western side, with a further 30/15/24 on the eastern side

His words were "88 each side", which to my simple mind means 88 east and 88 west, similar to what you found.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
His words were "88 each side", which to my simple mind means 88 east and 88 west, similar to what you found.

Course it is, I'm daft.

More haste, less speed. Thanks for putting me right.

One difference between practice on Phase 2 and what we saw today was that whilst most bases were cylindrical concrete with four bolts protruding there were quite a number of cylindrical with six bolts protruding, a much higher proportion than on Phase 2.

Dave
 
Last edited:

AM9

Veteran Member
Joined
13 May 2014
Messages
16,018
Location
St Albans
One difference between practice on Phase 2 and what we saw today was that whilst most bases were cylindrical concrete with four bolts protruding there were quite a number of cylindrical with six bolts protruding, a much higher proportion than on Phase 2.

Dave

Does that mean that individual cantilever towers will be used more than portals? The mutual support that portals give the bases might allow less substantial base structures.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
The bases run out at about MP18 and ...

MP18? PN18 Shirley? Opposite PN19?
--- old post above --- --- new post below ---
Does that mean that individual cantilever towers will be used more than portals? The mutual support that portals give the bases might allow less substantial base structures.

The six bolt bases are for twin track cantilevers rather than single track cantilevers; TTCs will be for signal sighting reasons (though the signals may not be in position yet).Full portals would only be used for three or more tracks, in stations, in complex layouts and on viaducts (such as Yarrow near Chorley).

AFAIK there aren't any portal sites in the areas "based-up" so far.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Are you sure your 34/18/33=88 tally is for BOTH sides, as that figure is as near as dammit what we found for the western side, with a further 30/15/24 on the eastern side

85 east, 86 west to be precise, with a few "maybes".
Quite a few were still sheeted up. Nothing at stations yet.
Edge Hill depot is still stuffed with steelwork, and the concreting vehicles were also there (minus motive power).
BB must still be using it as the base for Phase 4.

Nice to be back, but not on a cold grey miserable day like yesterday.
It's hard work counting bases through misted-up windows! ;)
 

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
Wow! Paul and I visited the site today and Orangemen said it will be coming down this weekend, so your info must be very hot off the press.


Yes it was only decided late yesterday, re instatement of the road was due for today Tuesday, with a view to it being re opened by Thursday, re scheduled for later in the year.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
I've now completed Monday's photos and their captions.

I have added Paul's shots to his album here:

https://www.flickr.com/photos/127646831@N03/sets/72157649792560381/

and added them and others to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083/

Thank you Paul.
--- old post above --- --- new post below ---
MP18? PN18 Shirley? Opposite PN19?
--- old post above --- --- new post below ---

The six bolt bases are for twin track cantilevers rather than single track cantilevers; TTCs will be for signal sighting reasons (though the signals may not be in position yet).Full portals would only be used for three or more tracks, in stations, in complex layouts and on viaducts (such as Yarrow near Chorley).

AFAIK there aren't any portal sites in the areas "based-up" so far.

Interesting as always, thank you.

I visited several sites on the line today, mainly aiming at level crossings.

Visible north of the footbridge at the northern end of Horwich Parkway are a pair of six-bolt bases directly opposite each other beside plain, straight double track through marshy ground.

Could some of the six-bolters be for stouter portals, some of which we dubbed TGBUs (Thundering Great Big 'Uns) on Liverpool to Manchester? They had more bolts than usual and appeared in poor ground in the Roby/Huyton area.

I saw the first shovel of spoil put in the holes on Grime Ford Bridge where services had been exposed, thereby starting the process of covering them over again.

Photos later and tomorrow.
--- old post above --- --- new post below ---
I got talking to a passer-by - 'Bill' - at Grime Ford Bridge, the upshot of which is that he has sent me a photo of the Skew Bridge being demolished, with the promise of more to follow.

I've downed tools and processed Bill's shot.

I have created his own album here:

https://www.flickr.com/photos/127646831@N03/sets/72157650900509369/

and added the shot to the Combined Volume. Please remember that the CV is in date order, so Bill's shot is towards the beginning. The numbers go in descending order, his shot is 3163m.

The Combined Volume is here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083/

Thank you Bill and welcome on board.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Updated Bridgeoscope below, please note the Kearsley works are due this weekend. If anyone can get along with camera, mobile, tablet or whatever....

Yesterday's photos later
 

Attachments

  • BridgesMVE1and2andPBN.xlsx
    16.6 KB · Views: 22
Last edited:

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
I'm going to get out for a peak this weekend during the possession as per, see what's going on here and there..:)
 

eMeS

Member
Joined
12 Jun 2011
Messages
954
Location
Milton Keynes, UK
I'm going to get out for a peak this weekend during the possession as per, see what's going on here and there..:)

Enjoy it while you can.
My experience in Milton Keynes is that major works such as these reduce the visibility of the track. A series of small adjustments, and short people like myself can struggle. Bridge parapets get raised, timber post & wire boundary fences get replaced with steel fencing with barely enough room to poke a lens through. At one rail crossing overlooking a junction, the lane bridge, in a slightly quiet area, has been given prison perimeter style fencing to about 10-12 feet high. In another area from which I filmed a Thunderbird uncoupling operation during OHLE works close to Euston, the trees planted to make the bank firmer, are growing well, and that visual access has now gone. Must learn how to walk and film on stilts!
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
What's happening at Kearsley this weekend? Is the pointwork going in already?

As per the Bridgeoscope, I understand that all level crossings (LC) on Phase 2 are to be replaced by bridges or closed.

I understand that the Kearsley LC (a foot crossing) is to be replaced by a bridge and that the bridge is to be installed this weekend, but I don't know what day.

I understand that the LC will remain open until the last weekend in April, when pedestrians will be diverted over the new bridge and the LC will be closed and, presumably, closed off.

I understand that the separate job of installing at least part of the crossover will take place next weekend, once again, I don't know which day.

Any errors in this are mine.

I hope people can get out there this weekend with camera etc, as I am unlikely to get the green light to do so.
--- old post above --- --- new post below ---
I'm going to get out for a peak this weekend during the possession as per, see what's going on here and there..:)

Excellent, happy hunting

Kind regards

Dave
--- old post above --- --- new post below ---
I've added Thursday's photos and films to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083/
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
Broughton Road overbridge is being replaced this weekend, that is one major task and a pretty large crane is involved.
 

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
Went out to Lostock this morning and a quick visit to Blackrod, usual workings going on at the bridge as expected, on the line towards Chorley teams were busy doing bases with road/rail equipment as I was driving away another concrete mixer arrived, down at Lostock from the Bridge on Lostock Lane I could see mast bases all over both sides of track towards Horwich Parkway and on the otherside towards Bolton pics to follow.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
According to the engineering notices the foot crossing at Kearsley is to be closed as of today (14th March) and replaced by a footbridge when the line is handed back on Monday.

There is to be a TSR imposed at handback on Monday on the Down Bolton line through Farnworth tunnel due to engineering works (10-over-15mph). The crossovers for the bi-directional use of the Down Bolton are supposed to be installed in a blockade next weekend but will be secured out of use until required. One crossover will be installed on the Bolton side of Moses Gate station (towards Moses Gate Jn) and will be known as Farnworth North Junction. The other crossover will be installed between Farnworth tunnel and Kearsley and known as Farnworth South Jn.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
According to the engineering notices the foot crossing at Kearsley is to be closed as of today (14th March) and replaced by a footbridge when the line is handed back on Monday.

There is to be a TSR imposed at handback on Monday on the Down Bolton line through Farnworth tunnel due to engineering works (10-over-15mph). The crossovers for the bi-directional use of the Down Bolton are supposed to be installed in a blockade next weekend but will be secured out of use until required. One crossover will be installed on the Bolton side of Moses Gate station (towards Moses Gate Jn) and will be known as Farnworth North Junction. The other crossover will be installed between Farnworth tunnel and Kearsley and known as Farnworth South Jn.

Very informative, interesting and helpful. Thank you.
--- old post above --- --- new post below ---
ALX400 has kindly sent seven photos taken in the last couple of days. I have added them to his album here:

https://www.flickr.com/photos/127646831@N03/sets/72157651121057352/

Bill Morton has kindly sent five photos he took today at Chorley Road Skew Bridge.I have added them to his album here:

https://www.flickr.com/photos/127646831@N03/sets/72157650900509369/

I have added all twelve to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083/

Ian Fitter has added a link in a comment on Photo 3436m Ridgeway Bridge. This link takes us to six fine 'then' photos he took of the bridge before reconstruction started.

Thank you ALX400, Bill and Ian.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
On Saturday I visited the Euxton-Chorley-Adlington area and examined several completed bridges (including the Chor aqueduct) and 3 under construction: Stump Lane, A673 Skew Bridge and Rawlinson Lane.

The old Rawlinson Lane bridge had apparently just been demolished. 5 machines (3 diggers and 2 grabs, two of them roadrailers and the others tracked) were feeding 3 tipper trucks with earth and rubble.

I was working N to S and evening was coming on so I came home, leaving the nearer bridges for another day, except to note that Grimeford Lane was still closed.

I think the bridgeometer is optimistic about Skew Bridge. The "decking" observed is not the bridge deck, it's just a layer of something like plywood, probably to protect the railway from anything dropped. Not all the beams are yet in place, and the concrete deck will follow the beams. It's a long tunnel-like bridge from the point of view of the railway, because of the high skew, and will have unused triangles of deck at each end.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
On Saturday I visited the Euxton-Chorley-Adlington area and examined several completed bridges (including the Chor aqueduct) and 3 under construction: Stump Lane, A673 Skew Bridge and Rawlinson Lane.

The old Rawlinson Lane bridge had apparently just been demolished. 5 machines (3 diggers and 2 grabs, two of them roadrailers and the others tracked) were feeding 3 tipper trucks with earth and rubble.

I was working N to S and evening was coming on so I came home, leaving the nearer bridges for another day, except to note that Grimeford Lane was still closed.

I think the bridgeometer is optimistic about Skew Bridge. The "decking" observed is not the bridge deck, it's just a layer of something like plywood, probably to protect the railway from anything dropped. Not all the beams are yet in place, and the concrete deck will follow the beams. It's a long tunnel-like bridge from the point of view of the railway, because of the high skew, and will have unused triangles of deck at each end.

Splendid. Were you able to take any photos?

Orangemen at Grime Ford bridge on Thursday said they understood the plan is to reopen it on Tuesday.

My reference to 'decking' in the Bridgeometer is my layman's ignorance of correct terminology. By 'decking' I meant 'beams'. Is decking further material which goes on top of beams?

I wondered about more beams being needed, but can't figure out where they would go unless the piers are extended further. Can you please interpret Bill's photos taken yesterday and posted on the Combined Volume last night?

Bridgeometer updated below.
 

Attachments

  • BridgesMVE1and2andPBN.xlsx
    22.2 KB · Views: 16

ironstone11

Member
Joined
3 Jan 2013
Messages
217
Splendid. Were you able to take any photos?
I wondered about more beams being needed, but can't figure out where they would go unless the piers are extended further. Can you please interpret Bill's photos taken yesterday and posted on the Combined Volume last night?

I think that what we see is the basis for the formwork for the decking. Temporary steel supports are being used on the left hand side to support this structure, whereas the finished abutment is being used on the right.

A huge triangular reinforced concrete slab will be cast with the long side resting on the abutment on the right.

The same being applied on the other side of the road which we cannot see.

The beams already place, further away from the camera will have a reinforced slab cast over them. (As will the beams at Blackrod.)

I don't think the bridge will be made as a box tunnel from the railway point of view, with unused triangles, although it might seem the best way to do it. Had that been the intention the abutment (pier) on the left would have been built.

The structures faced with stone on the left and right of the cutting are the bases for the bridge parapets, hence the reinforcing rods sticking out of the top. The reinforcing for the parapets on the bridge itself will be cast into the decking.

All in all, a lot of work still to do.

Hope this makes some sort of sense.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Splendid. Were you able to take any photos?
Sorry, I didn't have a camera or phone.

My reference to 'decking' in the Bridgeometer is my layman's ignorance of correct terminology. By 'decking' I meant 'beams'. Is decking further material which goes on top of beams?

Some bridges have steel beams. These have flanges top and bottom, so each beam looks in cross section like a capital I including its serifs, but there are gaps between the beams. Other bridges like this one use concrete beams, which are each shaped like an inverted T. The crossbars of the Ts (at the bottom) are contiguous, but there are gaps between the beams at the top. You can't lay tarmac on thin air, so in both cases you have to span the gaps with something.

This is the deck and it's made of reinforced concrete. Its thickness is a few inches, much less than the vertical depth of the beams. So when the beams are in place you lay formwork (to hold up the underside of the deck while the concrete sets), then you lay a grid of steel reinforcing bars. This interlinks with either protruding reinforcement from the concrete beams, or in the case of steel beams, with protruding bits of steel (called shear connectors) that were welded onto the tops of the beams when the beams were made.

Then you pour the concrete for the deck. Once it has set you apply a waterproofing layer, then you lay kerbs, put the pipes and cables back on the bridge, and lay the road and footway surfacing,
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
When I said in #677 that the deck was in place at Oldfield Road, Salford, I genuinely meant the deck, but following our recent discussion you've downgraded it to beams.


--- old post above --- --- new post below ---


The bases run out at about MP18

MP18? PN18 Shirley? Opposite PN19?

I think that was Mile Post 18, not signal number MP18 or PN18.
 
Last edited:

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK

Attachments

  • BridgesMVE1and2andPBN.xlsx
    27.6 KB · Views: 13
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I think that was Mile Post 18, not signal number MP18 or PN18.

Sorry I didn't realise the multiple levels of humour in Mr Locke's post.
Mile Post 18, yes. ;)

Incidentally, I can't find out who was the engineer for the Bolton & Preston Railway.
Was it indeed Joseph Locke? I thought he was busy elsewhere on the WCML at the time.
He didn't go in for tunnels...
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Sorry I didn't realise the multiple levels of humour in Mr Locke's post.
Mile Post 18, yes. ;)

Incidentally, I can't find out who was the engineer for the Bolton & Preston Railway.
Was it indeed Joseph Locke? I thought he was busy elsewhere on the WCML at the time.
He didn't go in for tunnels...

I'm reasonably certain I wasn't associated with the Manchester, Bolton, Bury Canal Navigation and Railway in 1838 nor the Later Bolton & Preston in 1841 (as far as Rawlinson Bridge) Chorley later that year or to Euxton in 1843; I suspect you might want Mr J Hawkshaw esq., late of this parish.

MP18 is on the Down Fast at Heaton Chapel, south of Slade Lane Junction. That's definitely not one of mine....
 
Last edited:
Status
Not open for further replies.

Top