QueensCurve
Established Member
- Joined
- 22 Dec 2014
- Messages
- 2,195
One of the current oddities at Euxton is the way Up Slow trains on the WCML heading for Bolton find themselves on the Down Bolton for a spell before reaching the Up Bolton.
That can't do much for the capacity of the junction.
It is a hangover from when British Rail remodelled Euxton Junction as a single lead junction.
This was remodelled again to a double lead a few years ago.
The really odd thing is that the Bolton lines join the fast lines and not the slow. Capacity would perhaps be enhanced if the fast and slow lines were transposed, but this would then presumably require a flyover between Euxton and Preston.