Topological
Established Member
Many threads have been written about the best way to solve the CrossCountry train lengths. The fact that Birmingham to Manchester is under wires often comes up.
Splitting services to run EMUs from Manchester requires two more terminating trains in Birmingham and presents a challenge.
However, could Avanti run the service as an extension of London trains?
Currently, there are Avanti from London arriving into Birmingham New Street at 27, 48* and 56 minutes past (though not every hour at all 3). Given the departures to Manchester are 30 and 01, these line up.
In the opposite direction there are arrivals from Manchester at 33 and 56 with the departures being at 17 21* and 47. The 33 lines up ok with the 47, but admittedly the other slot does not work as well.
* is the path usually from the North West/Scotland.
Manchester to Bristol is at xx:42
Manchester to Reading/Bournemouth is at xx:03
Bristol to Manchester arrives at xx:18
Bournemouth/Reading to Manchester arrives at xx:51
It would need a dedicated platform at Birmingham since you have the 51 forming the 03 and the 18 arrival forming the 42. It has been said that the 12 minutes turn around for the Reading would be too tight, so that may well be the biggest issue with this plan.
Is there a solution within this?
Splitting services to run EMUs from Manchester requires two more terminating trains in Birmingham and presents a challenge.
However, could Avanti run the service as an extension of London trains?
Currently, there are Avanti from London arriving into Birmingham New Street at 27, 48* and 56 minutes past (though not every hour at all 3). Given the departures to Manchester are 30 and 01, these line up.
In the opposite direction there are arrivals from Manchester at 33 and 56 with the departures being at 17 21* and 47. The 33 lines up ok with the 47, but admittedly the other slot does not work as well.
* is the path usually from the North West/Scotland.
Manchester to Bristol is at xx:42
Manchester to Reading/Bournemouth is at xx:03
Bristol to Manchester arrives at xx:18
Bournemouth/Reading to Manchester arrives at xx:51
It would need a dedicated platform at Birmingham since you have the 51 forming the 03 and the 18 arrival forming the 42. It has been said that the 12 minutes turn around for the Reading would be too tight, so that may well be the biggest issue with this plan.
Is there a solution within this?