the sniper
Established Member
- Joined
- 4 Sep 2007
- Messages
- 3,498
Soho North does get fixed.
The fixed diamond goes. The Up through siding becomes the Up Soho curve and the down line uses the existing crossovers. The overlap issue is sorted too so a train can actually get to Soho North instead of having to be held back.
A belated thanks for the info!