Rumour has it that the barriers have been suffering from uncommanded state changes, hence no fast trains down the Arun Valley today.

In other words the barriers have been going up and down without being instructed to do so.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
I read elsewhere that Billingshurst is still under local operation (IE box/crossing keeper), and hasn't gone over to the radar stuff yet. Not sure how true that is though!


Sent from my iPhone using Tapatalk
 

grid56126

Member
Joined
4 Sep 2011
Messages
295
It was the level crossing at Billingshurst and it was serious enough to cause an almost 24 hour closure. There was ONE incident that caused the closure yesterday, serious in itself, but the barriers were NOT going up and down without being instructed. I will let Network Rail answer the technical stuff!

The crossing is under local control, not sure how long for and it does look weird at the moment with the full booms that are not yet in use already in place up in the air, whilst the current booms are still being used. I would be surprised if that hasn't caused a few phone calls.
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,589
Location
PTSO or platform depending on the weather
If the barriers are under local control, are they worked from the station or by CCTV from Three Bridges (considering Billingshurst box is long gone)?

I heard elsewhere that the LIDAR sensors were too sensitive and being activated by dirt being flung up from passing traffic.
 

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
Local control might be however they was controlled before, or a crossing control using the pedestal controls


Sent from my iPhone using Tapatalk
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
A crossing controlled from an adjacent box will normally have its controls mounted on a pedestal next to a window overlooking the crossing - whereas local control normally refers to operation by someone other than the signalman who normally controls the crossing, using the local control unit immediately adjacent (although the signalman might have cause to use the local control unit if, for some reason, they can't be operated from the pedestal as normal!).
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,589
Location
PTSO or platform depending on the weather
A crossing controlled from an adjacent box will normally have its controls mounted on a pedestal next to a window overlooking the crossing - whereas local control normally refers to operation by someone other than the signalman who normally controls the crossing, using the local control unit immediately adjacent (although the signalman might have cause to use the local control unit if, for some reason, they can't be operated from the pedestal as normal!).

But the signal box has been abolished!
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
It'll still have a controlling (or supervising, probably a more appropriate term for MCB-OD crossings) signal box though - there'll be a local control unit of some sort (usually just a little grey cabinet) to enable a level crossing attendant to take local control if necessary. Perhaps that's how it's being worked in the interim, if the controlling box has been abolished before the new kit (supervised from elsewhere) has been commissioned?
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,589
Location
PTSO or platform depending on the weather
It'll still have a controlling (or supervising, probably a more appropriate term for MCB-OD crossings) signal box though - there'll be a local control unit of some sort (usually just a little grey cabinet) to enable a level crossing attendant to take local control if necessary. Perhaps that's how it's being worked in the interim, if the controlling box has been abolished before the new kit (supervised from elsewhere) has been commissioned?

Ah that would make sense then, thanks for clarifying
 

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,398
And again this afternoon:

Incident created 02/05/2014 16:11
Last updated 02/05/2014 17:25

A problem at a level crossing at Billingshurst means journeys are being delayed by up to 20 minutes between Horsham and Arundel.
 

bolli

Member
Joined
26 Sep 2011
Messages
195
And again this afternoon:

Incident created 02/05/2014 16:11
Last updated 02/05/2014 17:25

A problem at a level crossing at Billingshurst means journeys are being delayed by up to 20 minutes between Horsham and Arundel.

Rumored that trains are being cautioned over it after orders from the ORR.
 

Tio Terry

Member
Joined
2 May 2014
Messages
1,198
Location
Spain
Full automatic control of the crossing - without LIDAR - is due to be commissioned next weekend. It's currently under local control, no idea why it's got it's problems though.
 

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
I don't think it has anything to do with LIDAR, and more about the barriers raising themselves (that's what I have heard internally)


Sent from my iPhone using Tapatalk
 

Yabbadabba

Member
Joined
23 May 2014
Messages
385
Billingshurst MCB-OD was worked in local crossing clear mode during the 8 weeks it took to convert, from a small container adjacent to the the downside barrier with an attendant 24/7 and supervised by the signallers at TBSAC panel 7. The OD equipment came into use Thursday 15th May, the attendant was withdrawn and full automatic working commenced.
 

neilm

Member
Joined
3 Jan 2012
Messages
501
Has it gone wrong again? Seems to be level crossing issues again on the line.
 