Are there any services operated by Northern with more than 4 cars to accommodate growth or is there a limitation to 4 cars on account of station platform lengths not being maintained to accommodate larger trains.
Northern currently operate a small number of 6 car trains between Manchester Airport and Preston and the 0728 Halifax to Leeds is a 5 car train. There are a small number of other sprinter formations that are too I think. Pacer formations of 5 cars also turn up occasionally, but these offer much less capacity.
You haven't specified the route you travel on so it's a bit difficult to be any more specific.
Thanks. I was also thinking specifically of soon to be electrified routes such as Manchester to Blackpool where even 2x2 23m Class 156s are already longer than 1x4 20 Class 319s. I have been on the 1609 ex Preston to MIA which is 6 car ie 2 Class 185s one from Barrow the other from Blackpool. Presumably this will cease unless the dual modes can couple to the 319. Doesn’t look to me that this electrification with the train plan much as before over this section will yield more capacity, unlike the Liverpool to Wigan and Preston electrification earlier which did. Unless more than 3tph (plus the TPE Scottish) are planned isn’t it likely that overcrowding will continue or is 8 car operation planned?
Are there any services operated by Northern with more than 4 cars to accommodate growth or is there a limitation to 4 cars on account of station platform lengths not being maintained to accommodate larger trains.
Most smaller stops can only fit 3-6 coaches. Manchester Oxford Road can only fit 8 coach sets using SDO.
I have been on the 1609 ex Preston to MIA which is 6 car ie 2 Class 185s one from Barrow the other from Blackpool. Presumably this will cease unless the dual modes can couple to the 319. Doesn’t look to me that this electrification with the train plan much as before over this section will yield more capacity, unlike the Liverpool to Wigan and Preston electrification earlier which did. Unless more than 3tph (plus the TPE Scottish) are planned isn’t it likely that overcrowding will continue or is 8 car operation planned?