Chaos on the North Downs line today owing to a failure of the level crossing at Betchworth. However, NRE makes no mention of it, despite numerous severe delays and cancellations.

My train from Gatwick got to Reigate and sat there for about 15 minutes, despite a train making it through in the other direction while we waited. Then, to clear the platform for the Southern terminating train, we were de-trained for the unit to go into the siding. Once that had happened and the Southern train departed again (inexplicably waiting in the platform for three minutes after the signal cleared to green and with the driver in his cab and no-one boarding!), the GWR train re-emerged from the siding into service. It then sat, again, in the platform for a long time, with passengers re-boarding and the internal and platform information displays showing the normal stopping pattern.

Having my suspicions about the late running, I checked with the guard and she told me it would stop at Guildford and Reading only! I pointed out that no-one on board knew that and she suddenly thought to make an announcement! My personal journey aside, I don't know why Dorking could not have been included in the reduced stopping pattern (at the cost of only about two or three minutes), as there were a lot of passengers who were trying to reach there.

A pretty lax handling of the problem throughout - the railway has lost any sense of urgency in situations like this - late-running trains given clear signals but just sitting there for several minutes before moving, and some staff not knowing the basics of passenger information - the usual casualty. The train's PA was so soft that no-one could hear properly anyway and the driver had to bellow into his handset while leaning out of his cab door to make himself heard (I was by this time standing by his cab as he was doing it). The platform indicators were, of course, wrong throughout, meaning that newly-arriving passengers (mostly students) kept boarding the train and then having to alight again - a process that repeated umpteen times.

I felt sorry for the driver, who knew what he was about, but who was hindered by so much around him. Why our train could not have simply left Reigate towards Dorking before being forced to de-train by the following Southern train's arrival I don't know, but a train managed to come the other way at the same time across the failed level crossing.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,287
Why our train could not have simply left Reigate towards Dorking before being forced to de-train by the following Southern train's arrival I don't know, but a train managed to come the other way at the same time across the failed level crossing.
I doubt you would have been keen on sitting at Buckland for half an hour while the problem was resolved. Preference will always be given to passengers being able to be at a platform than progressing to a halt beyond one.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,465
Location
Gomshall, Surrey
I doubt you would have been keen on sitting at Buckland for half an hour while the problem was resolved. Preference will always be given to passengers being able to be at a platform than progressing to a halt beyond one.
I would, it almost certainly would not have been anything like that long and the stopping pattern would probably have been kept (as the delay would probably only have been around ten minutes rather than the 45 that ensued!), rather than missing so many out. As I said, a train passed the other way while the Reigate shunting to and fro was in progress, so passage over the crossing was being permitted. We also were authorised to pass a red signal at Betchworth on the outward journey, as the issue had been happening for some time. Staff, including a MOM were on site at the crossing. The issue at Reigate was clearing the platform for the Southern train, which would have been achieved by proceeding westwards.

== Doublepost prevention - post automatically merged: ==

Seems to be an issue this morning don’t know if it’s related trains are running late between Gomshall and Redhill and vice versa.
Only minor delays for a few early ones - now OK. Not a mention on NRE throughout!
 