On 28 march 2022, electric trains started running on the 12,5 km, single track, freight-only line between Bilzen and Genk-Goederen. This means that electric trains to (and from) the east can use a shorter route by avoiding the very busy station at Hasselt. The line was completely modernized, including new signalling and the introduction of ETCS. A new bridge was constructed to cross the Antwerp - Liège canal. This bridge is now 2 m higher than the old bridge to allow larger ships to pass.