I see from the New Civil Engineer that the construction of the replacement for Belfast's Gt. Victoria St. station - Belfast Grand Central, is well under way. It mentions a doubling of platforms from 4 to 8.

Does anyone know what service enhancements are mooted coming out of this increased capacity?


"We're very much looking to develop public transport in Northern Ireland and Belfast Grand Central Station is part of that," Brown added. "We're looking to double our rail capacity by constructing this station, from four platforms currently to eight, and we're providing 26 bus stands from our current 19.

"It's a significant investment in Northern Ireland and we're going to have the largest integrated transport hub in Ireland when it's complete in 2025."
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,294
Location
Glasgow
The greatest change I can think of the the switching of the Enterprise service to Grand Central from Lanyon Place, an alteration which has long been planned.

Not aware of any earmarked frequency uplifts.
 

bib

Member
Joined
15 Nov 2021
Messages
247
Location
East Midlands
Probably will depend on how passenger demand changes between now and 2025 or whenever it is due to open. I'd guess at a minimum they will also be able to run more of the recently extended 6-car units into GVS in the peak. Pre-covid the peak timetable contained quite a few extra services compared to the off-peak, but I think the current GVS is quite constrained for platform length and hence the extra platforms in the rebuild.
I think there's also a bit of extra track being put in to give a 3rd track for the first mile or 2 towards Lisburn, so that might enable extra services from Lisburn and Portadown, or the peak timetable to be extended for a bit.
I imagine in the long term there will be an aspiration to run more services or increase capacity on the main commuter lines to Bangor/Lisburn and maybe Carrickfergus, and maybe extend the hours of the peak time 2nd train per hour to Coleraine, though that'd probably need more passing loops to run reliably.
 

Steddenm

Established Member
Joined
2 Mar 2017
Messages
1,250
Location
Clane, Co. Kildare
According to Translinks blurb on BBC Newsline the other night:
• additional peak Belfast - Dublin services (using railcars)
• some Portadown services extended to Newry
• additional services to Larne Town (with extentions to the Harbour when required by the ferry)
• Enterprise services diverted into GC from LP
• feasibility study is reopening the Portadown/Lisburn - Antrim route
• half hourly service Belfast - Coleraine with 1tph to Derry~Londonderry and 1tph to Portrush
• City Metro service between York Street (New name for rebuilt Yorkgate) and GC and reverse to Bangor (calling at LP, Botanic and City Hospital twice)
 

bib

Member
Joined
15 Nov 2021
Messages
247
Location
East Midlands
It's mentioned in this youtube video that the passenger capacity of the new hub will be 14m per year, including the bus station, vs 6m for the current GVS/Europa complex, so there would appear to be plenty of scope for increasing services. Also gives some of the history of the site and a brief construction update, showing that the exterior of the new buildings appear to be progressing fairly rapidly.
Todays video is all about Belfast Grand Central Station.

What is Belfast Grand Central Station, you ask?

Belfast Grand Central Station (formerly Belfast Transport Hub), is a new integrated transport hub that is set to replace Great Victoria Street Railway Station and the Europa Buscentre.

Having a footprint of almost 900,000 square feet, it is going to be the largest integrated transport hub on the Island of Ireland.

This video was made to try and help clear up the mountain of misinformation and misunderstandings I see day-to-day on the internet surrounding the station.
 
Last edited by a moderator:

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,370
Location
belfast
As someone who lives relatively close, it does look like it is truly getting somewhere.

I wasn't aware of the coleraine improvements! that is amazing, and there is the long term aim to have the enterprise hourly all day and faster. There was also talk of extra earlier/later services

I have also heard of a vague aim to electrify Belfast-Dublin, but that is very much in the future, as they don't even know whether they would use 1500V DC overhead or 25 kV AC overhead
 

vic-rijrode

Member
Joined
31 Aug 2016
Messages
440
As someone who lives relatively close, it does look like it is truly getting somewhere.

I wasn't aware of the coleraine improvements! that is amazing, and there is the long term aim to have the enterprise hourly all day and faster. There was also talk of extra earlier/later services

I have also heard of a vague aim to electrify Belfast-Dublin, but that is very much in the future, as they don't even know whether they would use 1500V DC overhead or 25 kV AC overhead
Probably 1500V DC in NI and 25kV AC in the Republic - or just possibly vice versa.

I'll get my coat.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,370
Location
belfast
Probably 1500V DC in NI and 25kV AC in the Republic - or just possibly vice versa.

I'll get my coat.
The republic already uses 1.5kV DC for the DART, which is the only reason they're even considering it at all

So yeah, both systems is actually a possible outcome though the split would probably be somewhere in the republic

== Doublepost prevention - post automatically merged: ==

• City Metro service between York Street (New name for rebuilt Yorkgate) and GC and reverse to Bangor (calling at LP, Botanic and City Hospital twice)
A Metro train service? actually?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,618
Location
Nottingham
The republic already uses 1.5kV DC for the DART, which is the only reason they're even considering it at all

So yeah, both systems is actually a possible outcome though the split would probably be somewhere in the republic
They could always adopt the compromise they did for the track gauge in Victorian times, and take the average. Anyone for 12875V at 25Hz?
 
Joined
3 Sep 2020
Messages
179
Location
Dublin
So yeah, both systems is actually a possible outcome though the split would probably be somewhere in the republic
The current (no pun intended) assumption in the Republic is for 25kV outside the DART area, which would mean the changeover on the Dublin-Belfast route would be at Drogheda (assuming the present DART+ plans to be completed). Of course, a lot of things could change between now and any final decision on mainline electrification.
 

td97

Established Member
Joined
26 Jul 2017
Messages
1,556
I have also heard of a vague aim to electrify Belfast-Dublin, but that is very much in the future, as they don't even know whether they would use 1500V DC overhead or 25 kV AC overhead
25kV AC. Probably a long time off, given the desire is for 125mph running. More of a TRU whole route upgrade type project.
 

bib

Member
Joined
15 Nov 2021
Messages
247
Location
East Midlands
Interesting quote from a previous thread re - Belfast-Dublin
It was quicker when first upgraded to 90mph in the late-1990s it took 1h51-55 mostly, a few took 2+ hours due to extra stops. The congestion from augmented suburban services at both Belfast and Dublin ends really slows it down; it is now on near identical timings to the 1970s despite linespeed back then being only 70mph.
It'd take a lot of linespeed improvements in more rural areas even to make up for the 15-20mins it appears to be currently losing due to inter-running with Dart and local NIR services in urban areas.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,370
Location
belfast
Interesting quote from a previous thread re - Belfast-Dublin

It'd take a lot of linespeed improvements in more rural areas even to make up for the 15-20mins it appears to be currently losing due to inter-running with Dart and local NIR services in urban areas.
That may get better on the Belfast end with the switch to Great victoria street
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,507
According to Translinks blurb on BBC Newsline the other night:

• feasibility study is reopening the Portadown/Lisburn - Antrim route
It’d also be nice to think the Armagh line could be reopened at some point
 

WAB

Established Member
Joined
27 Jun 2015
Messages
1,295
Location
Anglia
The western routes from Londonderry to Sligo via Omagh and Enniskillen would be good for economically regenerating the western part of NI, but I suspect that'll have to wait until Irish reunification/an improvement in NI local politics (ha!)
 

vic-rijrode

Member
Joined
31 Aug 2016
Messages
440
The western routes from Londonderry to Sligo via Omagh and Enniskillen would be good for economically regenerating the western part of NI, but I suspect that'll have to wait until Irish reunification/an improvement in NI local politics (ha!)
We will have nuclear powered trains before Irish reunification.
 

Elwyn

Member
Joined
5 May 2014
Messages
564
Location
Co. Antrim, Ireland
It’d also be nice to think the Armagh line could be reopened at some point
There is a local group working on that. I saw a detailed presentation on it a year or two back. The trackbed is remarkably unobstructed. There’s 1 commercial building that would need to be demolished, and a roundabout at Portadown that will need altered but otherwise nearly all is intact and a location in Armagh has been identified to be the terminus. Armagh city council are very supportive. But it needs political and financial support from Stormont for it to happen.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,624
Location
Hampshire
There is a local group working on that. I saw a detailed presentation on it a year or two back. The trackbed is remarkably unobstructed. There’s 1 commercial building that would need to be demolished, and a roundabout at Portadown that will need altered but otherwise nearly all is intact and a location in Armagh has been identified to be the terminus. Armagh city council are very supportive. But it needs political and financial support from Stormont for it to happen.
Looking at Google maps, you'd have a bit of a tight squeeze at the Portadown end, with the A3 using some of the trackbed. Possibly enough for a single track line at least.
 

bib

Member
Joined
15 Nov 2021
Messages
247
Location
East Midlands
Lots of pictures of what I think is the bus station part of the hub in the skyscrapercity forum, there does seem to be one wall of the train station constructed.
The original source of some nice arial shots
1678188365840.png

== Doublepost prevention - post automatically merged: ==

A video from the contractor of the busway which will connect the station to the motorway. The busway bridge will pass over the re-located railway, and it looks like possibly foundations of 2 of the platforms at the rail station have been started.
 
Last edited:

bib

Member
Joined
15 Nov 2021
Messages
247
Location
East Midlands

Platforms are taking shape and steelwork is complete.
Contractor Farrans Sacyr JV, designer Arup and client Translink have celebrated Belfast Grand Central Station’s topping out ceremony to mark the completion of the main building’s steel frame.
The new transport hub will replace the current Europa bus centre and Great Victoria Street train station with an 8ha site in Weavers Cross, a new neighbourhood in the city centre. As a placemaking project and the largest integrated transport facility on the island of Ireland, the £105M has been funded by the Northern Ireland Department for Infrastructure.

Belfast Grand Central will be a multimodal transport hub with 26 bus ports, eight train platforms and bike lanes to foster sustainable mobility.
 

bib

Member
Joined
15 Nov 2021
Messages
247
Location
East Midlands
Looks like it could be complete this year, potentially Nov/Dec. There's been a lot of progress in the last year.
 

Basil Jet

On Moderation
Joined
23 Apr 2022
Messages
1,090
Location
London
Thanks, interesting stuff!

"When we move the Enterprise service we will have the capacity to go to an hourly service"

Why would the dedicated platform it currently has at Lanyon Place not be enough for an hourly service?
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,603
Location
Scotland
Why would the dedicated platform it currently has at Lanyon Place not be enough for an hourly service?
My guess is that it needs two platforms since the journey time isn't an even multiple of 1 hour, so sometimes the inbound train would arrive before the outbound leaves.
 