We often hear talk of the Beeching Cuts.

But at the time they happened, there was also a great deal of rationalisation. Whilst many lines and stations were closed, others were combined.

So how much new infrastructure had to be built at the time? Was it just a question of a few connecting curves, or were there any large sections of new track (and by large I really dont mean large, anything over a few hundred metres would count!)? And were there any new stations built. or old ones that had to be substantially rebuilt to extend them?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Along the bay

Member
Joined
2 Sep 2018
Messages
100
At Cornbrook, Greater Manchester, there was work done to allow CLC services to terminate at Manchester Piccadilly.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,163
Location
Wilmslow
Quite a lot of work was done in Leeds installing new curves to enable Central station to be closed. The ex-LNER side of City station was also completely rebuilt. In Edinburgh a new link was installed enabling Caledonian line trains to reach Waverley station and allowing the closure of Princes Street.
 

melon68

Member
Joined
9 Sep 2020
Messages
59
Location
Wexford, Ireland
Presumably the connection at Netherfield Junction near Nottingham was constructed around then to allow trains from Grantham to join the ex-Midland tracks into Nottingham instead of use the ex-LNER route that led to Victoria? That route was largely elevated with viaducts, some of which are still around today.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,529
Location
Neilston, East Renfrewshire
Just posted this in the 'Nottingam in isolation thread';

In the Sheffield area, various connections to allow trains from both Midland and Great Central routes to serve Tinsley Yard, including the magnificent junctions at Aldwarke, now sadly much reduced.

In Scotland the connections at Bowling to allow use of the Caledonian line to Dumbarton instead of the North British route, at Shields Junction in Glasgow so that trains could be diverted from St Enoch to Central, and in Edinburgh at Haymarket for Caledonian line trains to access Waverley.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,939
Location
Airedale
In the Sheffield area, various connections to allow trains from both Midland and Great Central routes to serve Tinsley Yard, including the magnificent junctions at Aldwarke, now sadly much reduced.
Tinsley can't be put down to Beeching :)
In Scotland the connections at Bowling to allow use of the Caledonian line to Dumbarton instead of the North British route, at Shields Junction in Glasgow so that trains could be diverted from St Enoch to Central, and in Edinburgh at Haymarket for Caledonian line trains to access Waverley.
Wasn't that done for N Clydeside electrification?

Not a connection, but the short-lived Boscarne Jn station was post-Beeching if not due to him. Reading Platform 4a does count, though, as new track was involved.
The Graham Road curve is probably too distant in time.

Other wartime connections at Yeovil and St Budeaux gained services as part of post-Beeching rationalisation.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
In late 60s a chord was added to the junction at Mickle Trafford near Chester to allow Mid Cheshire line services to terminate at Chester General instead of Chester Northgate.
 

Merthyr Imp

Member
Joined
24 May 2016
Messages
616
Location
Merthyr Tydfil
The connection from Newark Northgate to the Nottingham - Lincoln line was opened in 1965 which allowed the Lincoln to Grantham line via Honington to be closed.

If I remember correctly the Nottingham - Lincoln line was originally scheduled to be closed under the Beeching plan, but the Honington line wasn't. But the construction of the Newark spur meant Lincoln passengers for London could now have a direct service via Newark instead of having to change at Grantham.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,245
Apart from consolidation of city stations, much new Beeching era infrastructure was for freight.

- Major loops and loading/unloading facilities at collieries and power stations for Merry-Go-Round coal.
- Container terminals for Liner Trains.
- New terminals for bulk oil products.
- Major facilities at new large steelworks.

etc
 

Harvester

Established Member
Joined
9 Nov 2020
Messages
1,749
Location
Notts
Presumably the connection at Netherfield Junction near Nottingham was constructed around then to allow trains from Grantham to join the ex-Midland tracks into Nottingham instead of use the ex-LNER route that led to Victoria? That route was largely elevated with viaducts, some of which are still around today.
A bit later! The Grantham-Nottingham service could not be transferred to Nottingham Midland until July 1967. Because of this, and the work required to reopen Arkwright Street station for the Nottingham-Rugby shuttle, Nottingham Victoria did not close until September 1967.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,357
Location
The Fens
Apart from consolidation of city stations, much new Beeching era infrastructure was for freight.

- Major loops and loading/unloading facilities at collieries and power stations for Merry-Go-Round coal.
A good example of this is the Retford diveunder, opened in 1965. This enabled MGR trains to get to the big Trent Valley power stations at West Burton and Cottam, without crossing the ECML on the flat.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,436
Location
London
The Graham Road curve is probably too distant in time.
I stand for correction, but wasn't the Graham Road curve a 1980s addition to enable the last remaining trains to be diverted from Broad Street to Liverpool Street? Subsequently disused for regular passenger services in 1992 when they were withdrawn, along with the mothballing/closure of Primrose Hill.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
In Scotland the connections at Bowling to allow use of the Caledonian line to Dumbarton instead of the North British route
The Bowling diversion was carried out in 1960, before Beeching's appointment as BRB chairman.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,093
I stand for correction, but wasn't the Graham Road curve a 1980s addition to enable the last remaining trains to be diverted from Broad Street to Liverpool Street? Subsequently disused for regular passenger services in 1992 when they were withdrawn, along with the mothballing/closure of Primrose Hill.
That's correct. It was done in conjunction with the demolition of Broad Street station following its closure in 1986 to be replaced by the Broadgate development.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,529
Location
Neilston, East Renfrewshire

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,245
Yes indeed, but I though worth mentioning as a more general example of post-nationalisation rationalisation.
I believe it wasn't a rationalisation as such, but a diversion at electrification by building a short spur from the ex- North British line to the (very) closely parallel ex-Caledonian line to overcome tidal flooding on the former between Bowling and Dumbarton, where the two routes had always merged. The Caley line was at a higher embanked level, clear of the periodic high tides, and actually zig-zagged over the North British line twice in this section.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,529
Location
Neilston, East Renfrewshire
I believe it wasn't a rationalisation as such, but a diversion at electrification by building a short spur from the ex- North British line to the (very) closely parallel ex-Caledonian line to overcome tidal flooding on the former between Bowling and Dumbarton, where the two routes had always merged.