nottinghamcity
Member
I noticed this in "Rail Engineer "
http://www.railengineer.uk/2015/11/24/battery-powered-tram-record/
Seems that it would need specific stock to use on an existing network, but maybe an option for short extensions to existing lines.
http://www.railengineer.uk/2015/11/24/battery-powered-tram-record/
Seems that it would need specific stock to use on an existing network, but maybe an option for short extensions to existing lines.