Kneedown
Established Member
If it will work in a shorter train the Derwent valley line must be a candidate location. When the MML is electrified the Nottingham to Matlock service will run under the wires for over half its journey (Nottingham to Ambergate junction). The other half (Ambergate junction to Matlock) has lots of original low stone and metal footbridges in a world heritage site and would I suspect be difficult to electrify.
It would also allow the train to nip back to Bombardier in Derby if there are teething troubles!
DDB
I have to say i am in full agreement here.
Has battery technology evolved enough to make extended use of battery units viable and economic? However, If they could utilise the wires from Notts to Ambergate, then switch to battery for the short hop to Matlock and back, raising the pan again at Ambergate for an ac run back to Notts, recharging the batteries from the wires. This could also work on Derby-Crewe services as long as 35miles isn't too far for batteries. My vision is short hops off electrified mainlines.
I ultimately envisage an "Electrification Lite" a'la Paisley Canal for Matlock, but this is a possibility as long as the cost, weight and run time of the batteries make it viable.
--- old post above --- --- new post below ---
Not on my phone. On a very hot day, the battery gets warm and runs down quicker. Or perhaps I should say, appears to.. same result.
Perhaps when it cools down, it regains some of that lost power, but that's not going to be a lot of use.
I was always taught in Physic's that if you had a dead battery, put it under your armpit for a few minutes to warm it up and you'd get a bit more out of it.
