GRALISTAIR
Established Member
Are there any plans to progressively improve the OHLE on the ECML over a period of time. It seems the WCML OHLE reliablity has improved or am I mistaken?
Are there any plans to progressively improve the OHLE on the ECML over a period of time. It seems the WCML OHLE reliablity has improved or am I mistaken?
NR CP4 milestones said:This project is split into six distinct tasks:
defect survey – full survey of the ECML to record all defects, all outstanding campaign changes
and any existing non-conformances;
campaign changes – the implementation of 11 campaign changes. This is the removal of
components or designs with known reliability problems with a modern fit-for-purpose equivalent;
defect removal – in line with the campaign change delivery, all defects identified as a risk to
performance will be removed with highest priorities being delivered first. A separate work stream
will be used for tunnels where a non-intrusive survey is not practicable. Additional wire runs to
those listed below will be worked on as part of the additional scope;
vegetation – in conjunction with the lineside team, a detailed survey of all areas of critical
vegetation with specific regard to OLE will be undertaken. This will completed with due regard for
the Group Standards for new infrastructure with consideration of future schemes (such as Auto-
Transformer) being considered. This will include, where required, clearance back to maintainable
boundaries;
neutral sections – the upgrade of 78 neutral sections to a more reliable type; and
renewal of crossover and contact wire – the renewal of crossover/contact wire between Kings
Cross and Wood Green
Perhaps it will but Network Rail certainly think that it's worthwhile and they'd be in a position to know.
THANKS VERY MUCH FOR THAT INFORMATION - I just hope the politicians in future can get more balance "Do not do things on the cheap, but do not throw money at it either".
Out of interest, if it was possible, would you like to see LU converted to 25kV?
Probably not. As I mentioned earlier I have no issue with third (or fourth as it is on the LU) rail operations for metro services.
Only slightly off topic but I remember when the standard was an ETH index of 66. I thought the 37/4s were woefully inadequate and remember the Class 87s at an ETH index of 74? I think. Is there such a thing as ETH index anymore? What does a pendolino or other rate at now. It must consume a helluva lotta current?
I'd suggest the boundary of the London surburban area etc.
Only slightly off topic but I remember when the standard was an ETH index of 66. I thought the 37/4s were woefully inadequate and remember the Class 87s at an ETH index of 74? I think. Is there such a thing as ETH index anymore? What does a pendolino or other rate at now. It must consume a helluva lotta current?
I've noticed a lot of work has been taking place on substations and TP huts as I've been driving around recently, Ash Vale Substation has recently had things removed and knocked down and replaced. Weybridge Substation seems to be having something new built at the moment, so it would appear that there can't be any plans in the pipe line to convert the rest of the SWML from 3rd Rail to OHL.
I personally would rather keep 3rd rail as it's less of an eyesore, when taking a train through the country side you can look out the window and there's nothing to spoil the view but on OHL areas you look out the window and every so often you see the support for the electric supply cables which altough not a major thing I felt does spoil the view somewhat and if your walking through the countryside the OHL doesn't look so picturesque, however growing up with 3rd rail and non electric lines I could be a bit biased against OHL. As a driver on 3rd rail lines it's already hard to spot certain signals I could be wrong but I feel that if OHL is installed this could make difficult to spot signals even harder to see and considering all drivers on the SWML will have never seen OHL this could cause issuses when first installed, however this is just my personal opinion.
I've noticed a lot of work has been taking place on substations and TP huts as I've been driving around recently, Ash Vale Substation has recently had things removed and knocked down and replaced. Weybridge Substation seems to be having something new built at the moment, so it would appear that there can't be any plans in the pipe line to convert the rest of the SWML from 3rd Rail to OHL.
I personally would rather keep 3rd rail as it's less of an eyesore, when taking a train through the country side you can look out the window and there's nothing to spoil the view but on OHL areas you look out the window and every so often you see the support for the electric supply cables which altough not a major thing I felt does spoil the view somewhat
If you were as old as I am you'd remember when there were telegraph wires beside most railway lines. As you looked out of the window there was a telegraph pole every so often, and probably more often than the supports for OHLE. The wires hung down between the poles so as the train went along they seemed to swoop downwards after one pole and then up again towards the next.
But only on one side of the line, so if you sat on the other side of the compartment you wouldn't see them...though you might instead be looking at the corridor.
Good Link, I can see merit in what you are saying, as regards the MML but it just the hit of schemes in one go. Obviously if BR had not been so cash starved it might have achieved these schemes.
Perhaps when the ECML scheme was designed there was an assumption, or hope, that the latest design of rolling stock would be so much beter that it could cope with cheaper, lower specced OHL.
The slightest puff can bring the knitting down on parts of the ECML.
It's been pretty windy today and they seem to have stayed up...
The wires don't break but the support system can only withstand so much force, or is it designed to give way rather than risk pulling posts/gantrys down. Notice that Eurostar was disrupted today, Mon, due to catenary fault in France so we're not the only ones to have problems!
Also, in most of mainland Europe, there are thousands of miles of DC electrification with overhead lines rather than 3rd rail - the lines to the ski resorts of the Alps are electrified mostly to 1.5kV DC. I think they'd laugh at the concept of a 3rd rail system in such conditions.