Justin Smith
Established Member
I saw a picture the other day of Barnsley station (the ex Exchange one) with only one platform, though I accept that at that time the Court House station was also in operation !
Does anyone know when the second platform was opened ?
Also when the current buildings (not the 2007 Interchange) were built ? It was before 1998 because I remember visiting then and seeing them.
Thanks
Does anyone know when the second platform was opened ?
Also when the current buildings (not the 2007 Interchange) were built ? It was before 1998 because I remember visiting then and seeing them.
Thanks