Bank Station TWAO granted

Status
Not open for further replies.

plcd1

Member
Joined
23 May 2015
Messages
788
TfL have issued a press release confirming that capacity expansion works at Bank Station will now go ahead. The SoS has signed off the required Transport and Works Act Order.

https://tfl.gov.uk/info-for/media/press-releases/2015/december/major-upgrade-of-bank-tube-station-gets-the-green-light-for-work-to-begin

The Mayor and Transport for London (TfL) have announced that work to dramatically transform and improve Bank Tube station will begin in the new year after the plans were given the go-ahead by Government.

The £563m upgrade will increase the busy station's capacity by 40 per cent, improving accessibility and reducing interchange times when it is completed in 2021. Now approved, the station becomes the latest in a series of major upgrades taking place across the Capital.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HMS Ark Royal

Established Member
Joined
2 Sep 2015
Messages
2,798
Location
Hull
Personally, as the aider to a wheelchair user, I hope it means Bank becomes wheelchair accessable for the Drain and the DLR
 

StateOfPlay

Member
Joined
27 Aug 2015
Messages
96
Location
Private
So what in practicle terms will this involve?

From the link;

This vital interchange - at the heart of the City of London - will be modernised to include:

A new railway tunnel and platform for the Northern line that will reduce interchange times and create more space for passengers

Step-free access to the Northern line and DLR platforms

More direct routes, with two new moving walkways

Three new lifts and 12 new escalators

A new station entrance in Cannon Street

The redevelopment will complement current work to create a new entrance to the Waterloo & City line. Just metres away from Walbrook Square, the new entrance will offer two new lifts, four new escalators and a new ticket hall when it opens in late 2017
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,246
The platforms on the Northern Line are horribly narrow and congested, London Bridge was transformed when they rebuilt it (and the dreadful Angel platforms previously)

I hope they also improve the interchanges between the Northern and Central lines, as they are horribly cramped to fit in between the Northern Line platforms
 

Camden

Established Member
Joined
30 Dec 2014
Messages
1,949
I think this is going to be... interesting. I assume it will be Tower Hill for DLR services while this is going on?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,620
Location
Nottingham
The platforms on the Northern Line are horribly narrow and congested, London Bridge was transformed when they rebuilt it (and the dreadful Angel platforms previously)

I hope they also improve the interchanges between the Northern and Central lines, as they are horribly cramped to fit in between the Northern Line platforms

The Northern Line platforms are being modified in the same way as at London Bridge, with one running line being diverted into a new platform tunnel and the existing platform tunnel converted to provide much better access to both platforms. This is slightly different to Angel where there was an island platform in a single bore (as remains at the two Clapham stations) and this was also bypassed, but resulting in only two parallel tunnels rather than three. I don't believe Bank ever had island platforms.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,259
The platforms on the Northern Line are horribly narrow and congested, London Bridge was transformed when they rebuilt it (and the dreadful Angel platforms previously)

I hope they also improve the interchanges between the Northern and Central lines, as they are horribly cramped to fit in between the Northern Line platforms

Massively improved, involving a pair of long travelators (a late addition by the winning joint venture) and a number of additional escalators and a new circulating concourse level at the Central Line end.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
Are the 2 travelaters installed way back when to the surface still in situ and are they staying? I assume the new ones will be for Central, Northern and DLR Interchange?
 

plcd1

Member
Joined
23 May 2015
Messages
788
Are the 2 travelaters installed way back when to the surface still in situ and are they staying? I assume the new ones will be for Central, Northern and DLR Interchange?

Yes the W&C travelators are still there and no plans to remove them.

The two major schemes at Bank are all about adding new ways in and out of the station plus much better low level interchange and space (the Northern Line scheme). There is an awful lot going to be happening over the next 6 years with the W&C Walbrook entrance due in 2017 and the new Cannon St entrance, low level interchange and Northern line platform works due in 2021.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,246
Massively improved, involving a pair of long travelators (a late addition by the winning joint venture) and a number of additional escalators and a new circulating concourse level at the Central Line end.

Excellent, I wasn't expecting travelators, I'm surprised there's the space!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,259
Excellent, I wasn't expecting travelators, I'm surprised there's the space!

Neither were TfL, they weren't asked for in the tender. If you read the sequence of linked articles on the London Reconnections site, mentioned earlier in rebmcr's post you'll find that the winning bidder basically came up with a better solution to the one in the original specification.
 

TheNewNo2

Member
Joined
31 Mar 2015
Messages
1,008
Location
Canary Wharf
Just a point, but as they're LU, they'll be Passenger Conveyors, not Travelators!

No, I don't know why either. I guess maybe Travelator has unfortunate Gladiators associations.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,620
Location
Nottingham
Just a point, but as they're LU, they'll be Passenger Conveyors, not Travelators!

No, I don't know why either. I guess maybe Travelator has unfortunate Gladiators associations.

Travelator is, or was, a trademark of one of the makers. I thought the favourite "supplier neutral" term was "moving walkway".
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,259
Travelator is, or was, a trademark of one of the makers. I thought the favourite "supplier neutral" term was "moving walkway".

That's right - 'moving walkway' is the phrase used in the originally linked TfL statement.
 

TheNewNo2

Member
Joined
31 Mar 2015
Messages
1,008
Location
Canary Wharf
Travelator is, or was, a trademark of one of the makers. I thought the favourite "supplier neutral" term was "moving walkway".

All I know is that on our reports they're passenger conveyors, and have codes such as N115-C1.

(Note, I can't remember if N115 is Waterloo, but I mean it to be).
 

plcd1

Member
Joined
23 May 2015
Messages
788
For those pondering the details of the new layout then there are pdf drawings on a closed consultation about the Bank Station works.

https://consultations.tfl.gov.uk/tube/bankstation

Good public transport is vital to help London thrive and remain the engine of the UK economy. More and more people have been using Bank Station each year.

We believe our customers would benefit from:

more space to move through the station and on/off Northern line trains

reduced interchange times between different lines

improved accessibility

Therefore we are proposing to make substantial improvements at Bank.

You will need to page down and select "more images and information" to select the pdfs showing the new tunnels, escalators, ticket hall and general arrangement. You'll see this is a big and complex scheme. Looking at the timeline I had not appreciated before that the low level links and new platform open for use about 1 year before the new entrance on Cannon St is opened for public use.
 
Last edited:

Busaholic

Veteran Member
Joined
7 Jun 2014
Messages
14,671
Will Monument st ill be the 'official' interchange station for Bank, or will it be superseded by Cannon Street in the case of the District/Circle?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,259
Will Monument st ill be the 'official' interchange station for Bank, or will it be superseded by Cannon Street in the case of the District/Circle?

The new Cannon St entrance to Bank will probably be an OSI with the existing Cannon St underground, but there won't be an internal paid side link AFAICS, a walk along the outside pavement will still be required. As far as the diagrams show it suggests the new Cannon St entrance will still be a bit nearer to Monument than to 'Cannon St mainline', it seems to be at about the 66%/33% point of the distance at street level.
 
Last edited:

theageofthetra

Established Member
Joined
27 May 2012
Messages
3,565
Location
Beckenham
I am pretty sure the new entrance at Cannon St will be just up the road where the Mcdonalds is, I thought the whole block it is in was being knocked down. If so it will upset quite a few SE drivers!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,259
I am pretty sure the new entrance at Cannon St will be just up the road where the Mcdonalds is, I thought the whole block it is in was being knocked down. If so it will upset quite a few SE drivers!

Definitely is exactly where the McDonalds is. The barrier line seems to be roughly a few feet behind their front windows, and the escalators probably come up behind their counter...

Having checked on Google Earth I can revise the earlier distance comparison, it is about 200m from Cannon St LU entrance to the new Bank entrance on Cannon St, and just less than 100m further on to Monument.
 

theageofthetra

Established Member
Joined
27 May 2012
Messages
3,565
Location
Beckenham
As I feared. When would be the earliest the Mcdonalds would go? Can't have drivers going without brekkie & coffee now can we.
 

Busaholic

Veteran Member
Joined
7 Jun 2014
Messages
14,671
Definitely is exactly where the McDonalds is. The barrier line seems to be roughly a few feet behind their front windows, and the escalators probably come up behind their counter...

Having checked on Google Earth I can revise the earlier distance comparison, it is about 200m from Cannon St LU entrance to the new Bank entrance on Cannon St, and just less than 100m further on to Monument.

Thank you for all that information.
Could make an interesting variation on a drive-in McDonalds.:lol:
 