Just wondering if anyone could answer the following

Balloch services to and from Airdrie.

If services were to operate Balloch to Springburn and vice versus, would a 3 or 4 car cope with loadings, vice a 6 car?

If not

Would removing Anniesland to Singer stops mean a 3 or 4 car unit could cope with loadings?

3 or 4 car am basing on 385 example
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
3 Aug 2021
Messages
820
Location
Glasgow
Just wondering if anyone could answer the following

Balloch services to and from Airdrie.

If services were to operate Balloch to Springburn and vice versus, would a 3 or 4 car cope with loadings, vice a 6 car?

If not

Would removing Anniesland to Singer stops mean a 3 or 4 car unit could cope with loadings?

3 or 4 car am basing on 385 example

No.

When the weather is good. 6-cars aren't enough at Balloch.
 

Carntyne

Member
Joined
8 Jul 2015
Messages
1,023
Just wondering if anyone could answer the following

Balloch services to and from Airdrie.

If services were to operate Balloch to Springburn and vice versus, would a 3 or 4 car cope with loadings, vice a 6 car?

If not

Would removing Anniesland to Singer stops mean a 3 or 4 car unit could cope with loadings?

3 or 4 car am basing on 385 example
How are you retaining capacity on the Bellgrove-Airdrie section of the route?
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,496
Location
Neilston, East Renfrewshire
How are you retaining capacity on the Bellgrove-Airdrie section of the route?

Presumably the Milngavie/Springburn service would run to and from Airdrie, as there is certainly no need for 4 trains per hour between Bellgrove and Springburn. But the OP really needs to return to provide more detail!
 

SC318250

Member
Joined
4 Jun 2011
Messages
796
This reply will probably come under speculative but to answer above;
My thoughts were if Balloch to Springburn could run with 4 coaches, but operating non stop after Hyndland to Dalmuir then this service could operate 7 days a week.
Milngavie services could go to Larkhall.
Dalmuir then operates to Airdrie.
They would have to be other alterations to Sunday services etc but 5 x 4 car could then operate Springburn to Balloch. If 385 were to operate, they could operate from Eastfield. There are enough 385/1 outwith the 8 car Edinburgh services.
This in turn could possibly release another pair of 318/320 which in turn could release a pair of 380/0 for EK service. I reckon Lanark services also dont need 6 cars outwith the peak
 
Joined
3 Aug 2021
Messages
820
Location
Glasgow
This reply will probably come under speculative but to answer above;
My thoughts were if Balloch to Springburn could run with 4 coaches, but operating non stop after Hyndland to Dalmuir then this service could operate 7 days a week.
Milngavie services could go to Larkhall.
Dalmuir then operates to Airdrie.
They would have to be other alterations to Sunday services etc but 5 x 4 car could then operate Springburn to Balloch. If 385 were to operate, they could operate from Eastfield. There are enough 385/1 outwith the 8 car Edinburgh services.
This in turn could possibly release another pair of 318/320 which in turn could release a pair of 380/0 for EK service. I reckon Lanark services also dont need 6 cars outwith the peak
Where are you getting the 385/1s from? There aren't 5 sitting around!
 

SC318250

Member
Joined
4 Jun 2011
Messages
796
Sorry I should have said

I was thinking the 5 that are not on Edi-Gla with 3 cars going on them..
It was only a thought…
 

Top