Has the Southbound platform at Balcombe station ever been longer than 8 train carriages in length? Doesn't look to be enough room between/beyond Rocks Lane (under bridge) at the North end of the station, where I reckon there was once a signal box in the way and the B2036 London Road (over bridge) at the South end of the station. Happy to be corrected on this.
There's is however a story in the "Sussex Express" dated Friday 31st August 1962 stating that Balcombe station platforms would be lengthened during Saturday night, and that the 4.40 a.m. train from London Bridge to Brighton will be diverted via Oxted and Lewes, so maybe this was when it was done. But was the lengthening from 8 cartiage lengths to 12, or 4 carriage lengths to 8, or something else? And was it on both sides?
N.B. There's pictures of the damage caused in the April 1985 incident on a Facebook post in 2017 by local historian Steve Pitfold (titled 'Disused Railways of Sussex') and the damage looks quite substantial. (
Link below, sorry, not able to provide an extract).
As it came up yesterday, Clive Robey was kind enough to send me the pics of the unscheduled demolition of part of Balcombe station by a derailed freight in 1985. I think it qualifies here both for...
www.facebook.com
Not sure how long it took to fix the 1985 damage, I've seen a mention in a newspaper report online ("West Sussex County Times" dated Friday 17th May 1985) as to the line through Balcombe being closed for the weekend in order to repair damaged trackwork.
P.S. Notwithstanding the incident, according to the "Mid Sussex Times" dated Friday 6th December 1985, Balcombe station nevertheless still won the Southern Region's best kept station award, later that same year.