Hi
Bit confused about the following:
Do they mean that trains can run the wrong side at 12 trains per an hour, instead of 6? Also what other improvements are there. are they reducing the headways?
Bit confused about the following:
Network Rail will be making improvements to signalling on the Brighton Main Line this weekend and next, to increase capacity and reliability. As a result, buses will replace trains between Three Bridges and Brighton.
Passengers are reminded to check before they travel either at National Rail Enquiries or with their train operator Southern or Thameslink GTR.
Once the project to upgrade the line is complete, the lines around Balcombe and Haywards Heath will have a new signalling system to allow trains to run in both directions on both tracks, with new, and more reliable equipment and a doubling of capacity from 6 to 12 trains per hour.
These improvements to the Brighton main line are part of Network Rails ongoing programme of upgrade to the railway to accommodate the ever growing number of passengers taking the train.
Do they mean that trains can run the wrong side at 12 trains per an hour, instead of 6? Also what other improvements are there. are they reducing the headways?