http://news.bbc.co.uk/1/hi/england/6289761.stm
I've got Gatwick Express a few times (on "Any Permitted" through Savers; there's no way I'd pay their own silly fares), and it's been very easy to get a carriage to yourself, with half the train completely empty and the other half not even full. Meanwhile, at the same time, packed Southern services are being delayed due to the capacity demands of the Gatwick Express.
On my last trip the journey took 31 minutes - this is almost identical to the Southern journey time, and we spent several minutes blocking the Up Fast while waiting for a platform (or were we waiting for a train on the Down Fast?).
If GatEx is to be kept, then Gatwick station needs to be rebuilt, because the present situation is absolutely ludicrous, with these wasteful trains waiting to cross the paths of other trains in order to get in the platform.
I can't think of anywhere else in the country where there are so many conflicting moves and concequent delays caused as a result of such a sparsely used service running on the same line as extremely busy trains.
As King's Cross/St Pancras grows in importance, it would make sense to run more trains there. Thameslink 2000 could provide the necessary capacity through the Capital. Taking Gatwick Express doesn't save any time whatsoever on a journey from the North to Gatwick and beyond, IMO.
Get rid!
Axe it, I say!A review is ongoing into the future of the non-stop rail service from Gatwick Airport to London Victoria.
Government proposals are looking at possibly replacing the Gatwick Express with a stopping service in south London, Surrey and Sussex.
Andrew Pelling, the Conservative MP for Central Croydon, said it would "free up much needed track space".
Mr Pelling said commuter trains on the Brighton to London line were currently "more heavily used" than the Gatwick Express.
I've got Gatwick Express a few times (on "Any Permitted" through Savers; there's no way I'd pay their own silly fares), and it's been very easy to get a carriage to yourself, with half the train completely empty and the other half not even full. Meanwhile, at the same time, packed Southern services are being delayed due to the capacity demands of the Gatwick Express.
On my last trip the journey took 31 minutes - this is almost identical to the Southern journey time, and we spent several minutes blocking the Up Fast while waiting for a platform (or were we waiting for a train on the Down Fast?).
If GatEx is to be kept, then Gatwick station needs to be rebuilt, because the present situation is absolutely ludicrous, with these wasteful trains waiting to cross the paths of other trains in order to get in the platform.
I can't think of anywhere else in the country where there are so many conflicting moves and concequent delays caused as a result of such a sparsely used service running on the same line as extremely busy trains.
As King's Cross/St Pancras grows in importance, it would make sense to run more trains there. Thameslink 2000 could provide the necessary capacity through the Capital. Taking Gatwick Express doesn't save any time whatsoever on a journey from the North to Gatwick and beyond, IMO.
Get rid!