• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

AWC Derailment Pendolino recovery discussion

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
Is there the possibility that the damaged vehicle has structural damage that can't be repaired? If that's the case, what happens to the rest of the set? Some more 9 car sets become 11?
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,753
Location
Glasgow
Is there the possibility that the damaged vehicle has structural damage that can't be repaired? If that's the case, what happens to the rest of the set? Some more 9 car sets become 11?
If only 390033 front coach was usable. But I do think they can repair 117 anyway.
 
Joined
22 Jan 2024
Messages
588
Location
Yorkshire
Is there the possibility that the damaged vehicle has structural damage that can't be repaired? If that's the case, what happens to the rest of the set? Some more 9 car sets become 11?

Given that they've moved it by rail, it's unlikely that it has major damage.
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,828
Location
West is best
I'm not sure why there is such a fuss being made about propelling moves at triangles or similar layouts between or near junctions for short distances.

As long as the appropriate arrangements are made in advance between the TOC and Network Rail, such a move can be made possible.

Before top and tail operations became common, shunting moves that involved a main line loco propelling wagons on the main line for short distances were permitted in specified locations. It was the only way for certain sidings to be accessed. And indeed it is still permitted in certain specified locations.

The main thing is that any propelling move is risk assessed and properly controlled.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,595
Location
Neilston, East Renfrewshire
And indeed it is still permitted in certain specified locations.

Indeed it is, and propelling moves take place in Scotland every night, with passengers on board. However those regular operations are very different from propelling an 11-car Pendolino at locations where it is never done, with staff who do not normally carry out such moves, and it is therefore fraught with difficulty, and potential danger.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,560
Location
Lichfield
Forgive my ignorance, but what makes splitting 390s so difficult to do?
 
Joined
22 Jan 2024
Messages
588
Location
Yorkshire
Forgive my ignorance, but what makes splitting 390s so difficult to do?

Bar couplers, lots of cabling (both beside the gangway and beneath it). Traction equipment is spread throughout the train (which often wasn't the case with older, shorter EMUs) and includes motors in the driving cars, so the cabling will include the power wiring for those.
 

jamieP

Member
Joined
27 Feb 2012
Messages
311
Indeed it is, and propelling moves take place in Scotland every night, with passengers on board. However those regular operations are very different from propelling an 11-car Pendolino at locations where it is never done, with staff who do not normally carry out such moves, and it is therefore fraught with difficulty, and potential danger.
Where?
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,878
I'm not sure why there is such a fuss being made about propelling moves at triangles or similar layouts between or near junctions for short distances.

As long as the appropriate arrangements are made in advance between the TOC and Network Rail, such a move can be made possible.

Before top and tail operations became common, shunting moves that involved a main line loco propelling wagons on the main line for short distances were permitted in specified locations. It was the only way for certain sidings to be accessed. And indeed it is still permitted in certain specified locations.

The main thing is that any propelling move is risk assessed and properly controlled.
I’m not sure why there is a fuss being made about propelling moves in thus context at all. If the set needs to be moved elsewhere for repair, isn’t it entirely possible that Polmadie will repair the coupler and a suitable loco (or loco+coupling translator) used to move it?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,632
Location
Northampton
I'm not sure why there is such a fuss being made about propelling moves at triangles or similar layouts between or near junctions for short distances.

As long as the appropriate arrangements are made in advance between the TOC and Network Rail, such a move can be made possible.

Before top and tail operations became common, shunting moves that involved a main line loco propelling wagons on the main line for short distances were permitted in specified locations. It was the only way for certain sidings to be accessed. And indeed it is still permitted in certain specified locations.

The main thing is that any propelling move is risk assessed and properly controlled.
Any train can be propelled past 1 main aspect signal only, unless specifically prohibited. Propelling past more than one main aspect signal requires special authority, either from an Special Working Instruction in the sectional appendix or a temporary instruction.

The Rulebook rule means you need to find a triangle where the signalling setup is such that the propelling move only passes 1 main aspect signal, usually by starting the propelling move past a shunt signal, then propelling past the main aspect protecting the '2nd' junction. In older signalling installations this is quite a usual setup. In newer signalling installations there is quite often a main aspect signal protecting the wrong-direction move towards the first junction. This means that a lot of triangles now require passing 2 main aspect signals to turn. For MUs, light locos, push/pull or top/tail formations this is not an issue, but obviously for a propelling move it is.
 

Humftamuft

Member
Joined
4 Feb 2021
Messages
8
Location
Tameside
Forgive my ignorance, but what makes splitting 390s so difficult to do?
Not difficult, but time consuming.

Inter car hoses, Traction cables, 3ph cables and ETS cables all cars, additional 25kv jumper between transformer cars.
3 sets of data cables, earths and fibre optics within gangway.
Muff coupling removal from inter car couplers.
Good to split
 
Last edited:
Status
Not open for further replies.

Top