DaveyJones
Member
The external repaint and internal refresh were done at WidnesIrrelevant to post really, but Overhaul of 390 is in Manchester
The Overhaul is done at Longsight, the Bogies are done at Crewe Works

The external repaint and internal refresh were done at WidnesIrrelevant to post really, but Overhaul of 390 is in Manchester

Spot on. Bogies historically at Manchester, but now Crewe Works.The external repaint and internal refresh were done at Widnes
The Overhaul is done at Longsight, the Bogies are done at Crewe Works![]()
If only 390033 front coach was usable. But I do think they can repair 117 anyway.Is there the possibility that the damaged vehicle has structural damage that can't be repaired? If that's the case, what happens to the rest of the set? Some more 9 car sets become 11?
Is there the possibility that the damaged vehicle has structural damage that can't be repaired? If that's the case, what happens to the rest of the set? Some more 9 car sets become 11?
Could it be turned (if necessary) at Rutherglen?All of which require the damaged cab to either be capable of being driven from or coupled to!
That is definitely a feasible route.
Could it be turned (if necessary) at Rutherglen?
Right. My thinking was that it’s not that far to go.There is indeed a triangle there, but any such move would still require either the damaged cab to be driven from, or able to have a loco attached, or a propelling move.
And indeed it is still permitted in certain specified locations.
Forgive my ignorance, but what makes splitting 390s so difficult to do?
Where?Indeed it is, and propelling moves take place in Scotland every night, with passengers on board. However those regular operations are very different from propelling an 11-car Pendolino at locations where it is never done, with staff who do not normally carry out such moves, and it is therefore fraught with difficulty, and potential danger.
Where?
I’m not sure why there is a fuss being made about propelling moves in thus context at all. If the set needs to be moved elsewhere for repair, isn’t it entirely possible that Polmadie will repair the coupler and a suitable loco (or loco+coupling translator) used to move it?I'm not sure why there is such a fuss being made about propelling moves at triangles or similar layouts between or near junctions for short distances.
As long as the appropriate arrangements are made in advance between the TOC and Network Rail, such a move can be made possible.
Before top and tail operations became common, shunting moves that involved a main line loco propelling wagons on the main line for short distances were permitted in specified locations. It was the only way for certain sidings to be accessed. And indeed it is still permitted in certain specified locations.
The main thing is that any propelling move is risk assessed and properly controlled.
Any train can be propelled past 1 main aspect signal only, unless specifically prohibited. Propelling past more than one main aspect signal requires special authority, either from an Special Working Instruction in the sectional appendix or a temporary instruction.I'm not sure why there is such a fuss being made about propelling moves at triangles or similar layouts between or near junctions for short distances.
As long as the appropriate arrangements are made in advance between the TOC and Network Rail, such a move can be made possible.
Before top and tail operations became common, shunting moves that involved a main line loco propelling wagons on the main line for short distances were permitted in specified locations. It was the only way for certain sidings to be accessed. And indeed it is still permitted in certain specified locations.
The main thing is that any propelling move is risk assessed and properly controlled.
Not difficult, but time consuming.Forgive my ignorance, but what makes splitting 390s so difficult to do?