I've been thinking (dangerous!)...
Since Southern have withdrawn the 455s, there is now a lot more of the 3-car 377/3s being worked more intensively. These units were Coastway units but now being used on mainline workings and are non-standard on the 4/8/12 railway.
Could Bombardio build some additional Aventra cars to be inserted in to the 377/3s to make them 4-car units? Use the older Electrostar MITRAC computer system rather than the newer Class 345/710/720 software?
I'm thinking similar to how the South Western *spit* Class 455/7s received the aluminium Class 508 TSO cars.
The same logic could also be applied to the Southeastern 375/3 fleet.
Good idea or put the crayons away?
Since Southern have withdrawn the 455s, there is now a lot more of the 3-car 377/3s being worked more intensively. These units were Coastway units but now being used on mainline workings and are non-standard on the 4/8/12 railway.
Could Bombardio build some additional Aventra cars to be inserted in to the 377/3s to make them 4-car units? Use the older Electrostar MITRAC computer system rather than the newer Class 345/710/720 software?
I'm thinking similar to how the South Western *spit* Class 455/7s received the aluminium Class 508 TSO cars.
The same logic could also be applied to the Southeastern 375/3 fleet.
Good idea or put the crayons away?