craigybagel
Established Member
- Joined
- 25 Oct 2012
- Messages
- 5,820
There was no need to be quite so snarky - it's pointless arguing with you so let's leave it at that
With all due respect, as someone who's experienced similar issues on this forum myself it can be extremely frustrating when you're a member of staff with first hand experience to be told you're wrong by a well meaning, but presumably ill informed enthusiast. This particular guard has access to the speedometer, and can talk to drivers. If they say 802s can't do 125mph on diesel then that's pretty definitive for me.TPE (I'm assuming thats you're operator by the mention of 802208) go over the hilly pennines which will undoubtably slow the train down more than flat land, I would imagine the 802s can get to 125mph, just on flatter land and at a push on diesel.
I would also like to think they're experienced enough to know that trains don't go as fast when going up the kind of hills experienced on the TPE network - and that in any case there is no 125 running West of Leeds anyway.
== Doublepost prevention - post automatically merged: ==
One thing I don't understand in this talk about infrastructure - surely there are straight parts of the WCML that could have their non EPS speeds upgraded above 110mph without too much effort. I'm thinking Preston - Lancaster for example, or parts of the Trent Valley. Clearly the signalling, track and OLE are already good for higher speeds - so what's stopping non EPS trains running at higher speeds?