Belperpete
Established Member
- Joined
- 17 Aug 2018
- Messages
- 3,596
I recently travelled from Machynlleth to Birmingham with an advance ticket bought from TfW for the 1206 train, which I travelled on. I had a card ticket, so it was not scanned. We arrived into Birmingham late. The following day I received an email from TfW saying they believed that my journey may have been delayed entitling me to compensation. Great! However, when I clicked on the link to confirm the details and submit the claim, I found that the claim was not for the 1206 train, but for the 1306 train.
Now, my advance ticket was only valid for the 1206 train, so why did their system generate a claim for the 1306 train? Also, the 1306 train arrived in Birmingham on time, so no compensation would have been due for that train! Does anyone have any idea why this might have happened? And does this kind of thing happen regularly?
I rejected the claim, and will submit a manual claim for the correct train. I am assuming that had I submitted the claim, perhaps because I had forgotten which train I actually travelled on, it would likely have been rejected.
Now, my advance ticket was only valid for the 1206 train, so why did their system generate a claim for the 1306 train? Also, the 1306 train arrived in Birmingham on time, so no compensation would have been due for that train! Does anyone have any idea why this might have happened? And does this kind of thing happen regularly?
I rejected the claim, and will submit a manual claim for the correct train. I am assuming that had I submitted the claim, perhaps because I had forgotten which train I actually travelled on, it would likely have been rejected.