• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Australia HSR

Status
Not open for further replies.

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
And you thought our HS2 was going to take forever to build?

Australian governments second draft of a hgh speed rail plan. 1,748km, 144km of tunnel half of which is through Sydney. £77.87bn and could be completed by 2065!

tn_au-highspeed-map.jpg


http://www.railwaygazette.com/news/...stralian-high-speed-rail-study-published.html

Would be useful for me for visiting family if im still around in 52 years time :roll:
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

rf_ioliver

Member
Joined
17 Apr 2011
Messages
1,027
I was wondering about the map for a while...77bn for moving Sydney south of Canberra looks like good value...not sure what the Melbournians think about becoming a suburb to the west of Sydney though ;)

Being serious for a moment, read the full report...makes for very interesting reading

t.

Ian
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
The new plan is still a mess. Should be one linear route, Brissy-Gold Coast-Port Mac-Newcastle-Sydney-Canberra-Albury-Melbourne Southern X.

They hang on to using existing alignments thinking it will be cheaper and easier, but it really isn't.

To make the plan work, they need to consider where the existing airline market is, then steal it with an equal speed train service. Running a route out to Wagga Wagga is a no-brainer. They could get the Chinese to construct it, cost a fraction, and have it built by 2018.
 

LexyBoy

Established Member
Joined
23 Jan 2009
Messages
4,478
Location
North of the rivers
Interesting.

My initial thought was that it looks like it should naturally split into a Melbourne-Sydney route and a Sydney-Brisbane one. The Brisbane-Melbourne journey would be nearly 6 hours so I would think it would make sense to assess demand for each of the two routes from Sydney and make a case for that alone, rather than only the whole route. Not read the report yet though - am doing so now.
 
Status
Not open for further replies.

Top