Lots of train cancellations on journey check this evening. unit shortage is getting worse by the day!
Don't hold your breath. I can see bustitution for a while yet
Lots of train cancellations on journey check this evening. unit shortage is getting worse by the day!
If only Welsh Govt had been warned and we had predicted and had seen this situation coming..............(insert head in hands emoji)Things really are tight at the moment: the list of scheduled cancellations for tomorrow look very similar to today's: Nothing at all running on the Conwy Valley, several cancellations of morning services in West Wales, and a smattering of Marches/Swanline services being terminated short with some other services picking up stops.
I wonder what the ratio of storm damage / wheel flats / PRM mod absences is...
If only Welsh Govt had been warned and we had predicted and had seen this situation coming..............(insert head in hands emoji)
Currently on 175-011 (I think) from Crewe to Shrewsbury (1908 Carmarthen service) and surprise surprise it's full and standing. I'm in the back cab end vestibule and was so rammed until Nantwich I almost f***d a woman and I'm not even straight.
*hits imaginary like button*Currently on 175-011 (I think) from Crewe to Shrewsbury (1908 Carmarthen service) and surprise surprise it's full and standing. I'm in the back cab end vestibule and was so rammed until Nantwich I almost f***d a woman and I'm not even straight.
Unfortunately, short forms do happen. Just look at the GWR network! My friends were on that train and it was standing room from Shrewsbury to Machynlleth.
I was on the one two hours before that was 4 coaches and only half loaded.
My benchmark for the new franchise was the elimination of 2 car DMU's working long distance service into Manchester/Birmingham/Cardiff- TfW still have a long way to go.
Remember the specification for the franchise allowed 20 minutes standing around major cities at peak times- here we have an off peak service that has had people standing on it for 150 minutes!
Haven't you spent the last few months ridiculing anyone who expected instant changes, yet here you are doing exactly that yourself. The hypocrisy is hilarious.![]()
Glad you can see your own hypocrisy. Complaining yourself about things you ridiculed others for complaining about.
About 10 years too late. The UK government should never have let a 15 year no-growth franchise in 2003; it should either have been a 20 year franchise with growth allowances (so that the TOC would be required to invest to make the fleet PRM compliant) or a 5-7 year no-growth one (meaning a new for-growth franchise let in 2010 could have been required to make the fleet compliant). I suppose in 2013 the Welsh Government could have ordered new trains or aranged a hire of LHCS but I can to some extent understand why they would consider it to be not their problem (no block-grant allocation from Westminister for spending on rail; not at the time anyway - I assume there is now that the franchise has been devolved).They were as far back as 2013 about the PRM Mods.If only Welsh Govt had been warned and we had predicted and had seen this situation coming..............(insert head in hands emoji)
So, has Machynlleth got it's toilet-emptying facilities?I'm now on a PRM modified 158 (818) for the first time on the 2032 Shrewsbury to Aberystwyth. Of course, before it even departed, I just had to try out the vacuum CET (disabled one). Seems to be working fine![]()
*hits imaginary like button*
Unpopular opinion perhaps but I feel like maybe until more stock comes in they bustitute:
Cardiff Bay shuttle (use the 153 on Valleys to free up a 150)
West of Carmarthen
Conway Valley Line
and reduce frequency on Valley Lines
to free up 150s. They could then operate double 150s on some 2 carriage 175 diagrams, and then use some of the 2 carriage 175s freed up by this to strengthen some of the remaining 2 carriage 175 diagrams.
Unpopular opinion perhaps but I feel like maybe until more stock comes in they bustitute:
Cardiff Bay shuttle (use the 153 on Valleys to free up a 150)
West of Carmarthen
Conway Valley Line
and reduce frequency on Valley Lines
to free up 150s. They could then operate double 150s on some 2 carriage 175 diagrams, and then use some of the 2 carriage 175s freed up by this to strengthen some of the remaining 2 carriage 175 diagrams.
Never going to happen. Whilst I'm not saying some of your ideas don't have merit, previous actions under Arriva suggest little appetite for sacrificing Valley line services over mainline. I'd be very surprised in particular if Bay branch was touched - politically it wouldn't go down well with the folks in the WAG, and also it would take a huge chunk out of the entire franchise''s PRM in one go (IIRC, around 15%. 5 trains an hour each way all day soon adds up!).
If there were an ammended timetable of bustitution for the Bay branch, wouldn't that take care of the PPM issue? (Leaving only the political ones.)
It's notable that the Conwy Valley and West Wales have already seen services suspended for lack of units, as well as between Shrewsbury and Cardiff (ex Holyhead) as Gareth suggested.
Has anyone seen a fully PRM modified 150 yet? If TfW Rail start sending the 150s to be modified in January, 3 a month need to be done. If they can't start sending them away until the 769s arrive, assuming the 769s are in service by May/June, 6 a month need to be done.
As well as 158s left to do.
Are the buses ready?![]()
Shouldn't TfW Rail be panicking already?Seems difficult to find any information regarding the 150s apart from info that 284 and 285 are in but there is a suggestion that they could be undergoing corrosion work. When GWR ones were going in for corrosion problems to be rectified, some were taking many months depending on the severity. The have been stories coming from Northern that 144s going off lease were transferring to TFW as a stop gap as a result of the late 769s but it seems TFW know nothing about such an arrangement. Things could change, of course, especially if TFW start panicking.
spotted at Aberystwyth station on the 7/11/18 2340 Machynlleth service still unmodified - maybe it was at Wabtec for something else...?158838 Shrewsbury to Wabtec Doncaster
http://www.realtimetrains.co.uk/train/K91540/2018/10/18/advanced
If you're using "buses" as a euphemism for Northern's 144s, I'm afraid not!Has anyone seen a fully PRM modified 150 yet? If TfW Rail start sending the 150s to be modified in January, 3 a month need to be done. If they can't start sending them away until the 769s arrive, assuming the 769s are in service by May/June, 6 a month need to be done.
As well as 158s left to do.
Are the buses ready?![]()
No I meant real, road replacement buses.If you're using "buses" as a euphemism for Northern's 144s, I'm afraid not!