Is the Atherton line an example of a principle railway route open today which is inferior to how it was 60-70 years ago? In most cases it is the other way round, but in the case of Atherton line, it used to carry long distance services in its 4-track layout. Nowadays it only carries local traffic, reduced to 2 tracks and the linespeed is only 50mph. Was the quality of the rail better when it handled long distance services or has the signalling regressed? And was there a more frequent service than there is now?
I think it’s fairly obvious that the Atherton line aka the L&YR Pendleton and Hindley cutoff provided a vastly superior service as a 4 track main line, with all the capacity offered, when it carried many non-stop expresses to Liverpool Exchange and Southport, taking barely longer than half an hour from Victoria and very much freight on the slow lines in addition to some local stopping traffic, but that’s what the DfT and Beeching sympathisers don’t want you to know.
Given that it was designed and built as 4 tracks from the start, something very rare indeed, it doesn’t really function with only 2 tracks. I suspect the 50mph line speed has not been increased so as to force trains to take the same amount of time as those taking the longer Bolton route at 75mph, which really defeats the object.
To rub even more salt into the wound, the present signalling has very few block sections, all of which are quite long. The lack of capacity on the Atherton line as well as in Manchester itself forces Southport and Kirkby serves to be tacked onto the residual slow Atherton paths, extending journey times to quite unacceptable levels, more than double what it used to take.
It’s very interesting to see maps of the complex of sidings along the line, including those serving Peelwood Colliery, but of course all gone now. Not to mention the Westwood Park, Dobbs Brow, Hilton House or Agecroft and Brindle Heath lines that all fed into the Atherton.
Only last week I learnt of the proposals made by Henry Eoghan O’Brien, Chief Electrical Engineer of the L&YR at Southport 1903-09, for blanket electrification of the Lancashire and Yorkshire Railway to be extended from Southport to Goose Hill, Doncaster and Goole including all branches and sidings on the basis that it was the most densely trafficked system of lines in Britain and therefore likely the world.
This suggestion led to his dismissal by the directors of the LMS in 1924 and the fast lines were lifted after closure in 1965, but just imagine all 4 tracks electrified with third rail expresses running on the Atherton to all destinations like on the Southern.
It's a bit like the Merseyrail Ormskirk line in once being a mainline but no more, though sadly its modern day service isn't as good. Not better, not worse, just different?
The Ormskirk electric service has at least survived in tact, unlike the expresses via Ormskirk or Atherton, or the electric service to Crossens.
Looking at timetables available on
Timetable World, the service back in the 1960s was terrible in comparison to what is available now.
In what way could it possibly have been terrible while the full 4 track alignment was open before 1965? Were journey times from Southport to Victoria under an hour? That’s better service than now.