GatwickDepress
Established Member
Hastings itself only has two stabling sidings at Alexandra Park, which is insufficient, hence Southeastern stabling a 375 overnight at platform 1. The former carriage shed at Ore is now a housing estate and the goods yard at Hastings is now Sussex Coast College so nothing can be expanded there.Ramsgate does have a depot and the facilities though does Hastings?
Although, moving westwards, there's St Leonards Railway Engineering Limited at West Marina depot. They currently have a contract to refuel and maintain Southern's 171s and some GBRf/DBS locomotives, among other companies. The 5-lane inspection shed opposite the main shed is used by Southeastern 375s, and I think can take 12 car formations, so it could occupy two Javelins end-to-end.
So I suppose, to my amateur mind, that's it could be feasible to contract SLREL for routine maintenance and internal/external cleaning of the Javelin trains, with anything necessitating major work being sent to a suitable depot?
