• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Are Network Rail really this poor?

Status
Not open for further replies.

nuneatonmark

Member
Joined
5 Aug 2014
Messages
491
I've been travelling up and down the West Coast Mainline quite a bit recently and at least 50% of my journeys have been significantly impacted by infrastructure issues incl points failures and signal failures. Given the regular maintenance closures, should I surprised at just how poor and unreliable the infrastructure is? Are Network Rail just a little ****e?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CaptainHaddock

Established Member
Joined
10 Feb 2011
Messages
2,712
I've been travelling up and down the West Coast Mainline quite a bit recently and at least 50% of my journeys have been significantly impacted by infrastructure issues incl points failures and signal failures. Given the regular maintenance closures, should I surprised at just how poor and unreliable the infrastructure is? Are Network Rail just a little ****e?
Google "network rail modernising maintenance" and you'll have your answer.
 

lordbusiness

Member
Joined
17 Dec 2014
Messages
242
If the recent number of NR related incidents on Anglia is anything to go by..........yes
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,953
Location
London
Short answer, yes.

Budget has been refocussed on just trying to keep things as they are, not enhancements. Given various factors including assets age, climate change, intensity of use, then things will not improve.

Next question?
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,506
I’d say major infrastructure failures on the WCML are pretty rare, some other routes not so much maybe.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,610
Location
Crewe
I’d say major infrastructure failures on the WCML are pretty rare, some other routes not so much maybe.
Depends on what constitutes major. There is quite often at least 1 failure per week where the delays are in the thousands of minutes
 

boiledbeans2

Member
Joined
15 Oct 2020
Messages
962
Location
UK
I attended a talk by Network Rail earlier this year. It was titled "Spending Money Wisely to Deliver a Reliable Railway".

The speaker seemed quite proud that Network Rail had achieved the optimum point between ensuring low failures and spending money. I don't remember the exact technical terms used, but beyond that optimal point, a lot more money has to be spent for a smaller reduction in failures.

The speaker also showed statistics which showed that the failures were actually reducing year-on-year (I don't think anyone in the audience believed it!)
 

The Sorcerer

On Moderation
Joined
6 Feb 2024
Messages
32
Location
Avalon
Network Rail is a basket case. They need to stop concentrating on putting up fencing and start maintaing the infrastructure.
 

alxndr

Established Member
Joined
3 Apr 2015
Messages
1,679
Network Rail is a basket case. They need to stop concentrating on putting up fencing and start maintaing the infrastructure.
Fences aren’t going to impact point failure numbers, but they might reduce trespass incidents.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,419
Location
Lichfield
I’d say major infrastructure failures on the WCML are pretty rare, some other routes not so much maybe.

I'd disagree here, not many weeks go by where services out of Euston don't totally collapse.
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,506
I'd disagree here, not many weeks go by where services out of Euston don't totally collapse.
Many have been due to train failures (mainly freight) trespass etc, rather than major infrastructure failures.
 

class ep-09

Member
Joined
5 Sep 2013
Messages
632
Fences aren’t going to impact point failure numbers, but they might reduce trespass incidents.
Which happen regardless …

Besides - I know it is legal requirement and quite strange one, to have fencing / physical barier everywhere on the network.
If we compare UK and other countries that are not bothered about trespasses , except high speed lines , perhaps if UK adopted similar approach there would be less delays due to such incidents.
.
I know someone will say “ what if they die or get injured while tress passing?” .

Everybody Knows the railways are dangerous to wonder around , secondly if someone wants to leave this world by being killed by train , they will do it anyway.

.
 

sh24

Established Member
Joined
28 Sep 2023
Messages
1,478
Location
London
As regular passengers on the GWML will know, there are certainly some challenges to be addressed
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
Landowners and building operators have responsibilities to everyone including trespassers under the health and safety at work act. Part of that reasonably includes fencing off dangerous areas. It would also fly in the face of declaring rail trespass a criminal matter rather than civil.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
Fencing also helps with livestock which will all know can cause huge disruption.

Failures on NR are decreasing from what I remember, but the impact of failures is increasing. So it seems worse.

As an addition, recently there has been a huge increase in concern for welfare... Which are hugely disruptive as Leeds found out last week.
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,714
Everybody Knows the railways are dangerous to wonder around
You're overestimating the intelligence of the general public. A lot of people who trespass aren't aware of the risks.

In the Netherlands "spoorlopers" cause up to 4.5 hours of delay minutes every day. By walking along the railway as "a quicker way to get from A to B" because the normal road design is suboptimal for their route. Or they're walking their dog and to them the cess looks like any other walking path. Or just kids playing where they shouldn't.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,518
Location
Neilston, East Renfrewshire
They need to stop concentrating on putting up fencing and start maintaing the infrastructure.

Fences aren’t going to impact point failure numbers, but they might reduce trespass incidents.

Yes indeed; My last train from Glasgow to London terminated at Preston; A trespass incident (much) further south had prevented the relief Driver from reaching Preston (a type of incident which forms part of Network Rail's performance statistics despite often being unpreventable).

I travel regularly, once a month at least, on the WCML, between Glasgow Central and Euston or Birmingham, and have certainly had my fair share of delays. Sometimes due to infrastructure failures, however in the last five years the most disruptive incidents were freight train failures (the same freight train, twice, costing 240 and 100 minutes!) and flooding.
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
Modernising maintenance. 'Nuff said.

== Doublepost prevention - post automatically merged: ==

Failures on NR are decreasing from what I remember, but the impact of failures is increasing. So it seems worse.
Definition of 'failure' has changed
 

Tractor2018

On Moderation
Joined
31 Jan 2018
Messages
191
Modernising maintenance. 'Nuff said.

== Doublepost prevention - post automatically merged: ==


Definition of 'failure' has changed

This

"Modernise". And move the goalposts to show how effective it is. Real outcome - well, everyone can see it.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,419
Location
Lichfield
Many have been due to train failures (mainly freight) trespass etc, rather than major infrastructure failures.

I'm not so sure about that...

Today we have a loss of signalling at Colwich and OLE problems at Tile Hill, last Wednesday it was signalling issues around Watford...
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,486
Location
Powys
Which happen regardless …

Besides - I know it is legal requirement and quite strange one, to have fencing / physical barier everywhere on the network.
If we compare UK and other countries that are not bothered about trespasses , except high speed lines , perhaps if UK adopted similar approach there would be less delays due to such incidents.
.
I know someone will say “ what if they die or get injured while tress passing?” .

Everybody Knows the railways are dangerous to wonder around , secondly if someone wants to leave this world by being killed by train , they will do it anyway.

.
Oh that it was that simple!
What many here don't realise is that in nearly every case the original, enabling Act states that the railway line has to be "enclosed", so to do away with lineside fencing would require each and every Act to be changed, or an over-riding Act would need to be passed rescinding those paragraphs in all those Acts.
And quite frankly the government (of any hue) doesn't have the time or money to do that.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,901
Location
London
The WCML is relatively reliable in comparison to the GWML from my experience, then again it does highlight that NR aren't really repairing things as quickly as they should on both mainlines.
 

Omnishambles

Member
Joined
13 Jul 2019
Messages
204
The WCML is relatively reliable in comparison to the GWML from my experience, then again it does highlight that NR aren't really repairing things as quickly as they should on both mainlines.
I would tend to agree but with a slight change in wording, WCML=not so good on days and in areas more than others, GWML=worse by comparison… The key thing, and goes for all routes, is regardless of responsibility it is the (mis)management of the service around any failure that has got worse steadily worse over the years with delay per incident never grappled. Service Recovery is certainly 2 words that are said together but not carried out from what I can see nowadays
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,901
Location
London
I would tend to agree but with a slight change in wording, WCML=not so good on days and in areas more than others, GWML=worse by comparison… The key thing, and goes for all routes, is regardless of responsibility it is the (mis)management of the service around any failure that has got worse steadily worse over the years with delay per incident never grappled. Service Recovery is certainly 2 words that are said together but not carried out from what I can see nowadays
Agreed, which is why I don't disagree with those against NR's so called "Modernising maintenance" plan.
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
I get the idea NR are something of a dumping ground for railway debt? I'm a little surprised they manage to get anything done at all honestly. I've ranted enough about fragmentation already though.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,317
Yes indeed; My last train from Glasgow to London terminated at Preston; A trespass incident (much) further south had prevented the relief Driver from reaching Preston (a type of incident which forms part of Network Rail's performance statistics despite often being unpreventable).
which perfectly illustrates why the "lean and mean" railway is not fit for purpose. Integrated railways understand this and have enough spare staff at key relief points like Preston for an extra crew to be inserted to keep the network running, not cancelling trains just because "the crew haven't arrived off their inward working."
Not necessarily anything to do with NR, but if you want a reliable railway you have to fund the infrastructure and make sure tha the operation is robust.
 

meld3

Member
Joined
28 Aug 2019
Messages
204
Location
West Midlands
I agree with the original poster - Yesterday was a clusterfk day with many cancelled trains Eus-Bham due to overhead line issues near Coventry, and many delayed trains due to signal issues near Crewe. Both are down to NR ?
 
Status
Not open for further replies.

Top