coupwotcoup
Member
- Joined
- 29 Jul 2007
- Messages
- 287
..I heard on the radio the other day that because of signal failure, the branch line between Southminster and Wickford was suspended (with no bus replacement service either... good old One).
Now this got me thinking. Surely as a single track line why couldn't one train just do shuttle runs? Then again I suppose with a lot of level crossings on said route, the old 'elf and safety' thingy comes into play?
Now this got me thinking. Surely as a single track line why couldn't one train just do shuttle runs? Then again I suppose with a lot of level crossings on said route, the old 'elf and safety' thingy comes into play?