tbtc
Veteran Member
In that case the 365s are an interesting unallocated set of units
Agreed; I'm surprised I've not seen reference to them working elsewhere. If they are suitable for London - Cambridge/ Peterborough services (albeit there are faster alternatives for "end to end" journeys) then they could easily do London - Oxford.
Given that the Thames Valley electrification seems to be about wiring the main lines (and not doing the various branches like Henley/ Windsor) I think 365s may suit the move west (which would leave more 319s to be allocated to the West Midlands/ Lancashire.
If the 319s and 365s are used on newly electrified routes then the 317s and 321s could replace at least some of the older EMUs still in existence
Again, agreed. My only question with this (and it's not intended as a rhetorical one) is whether we should be looking to replace the oldest EMUs (313s/ 315s etc) or trying to replace Pacers (using these older EMUs to do so, if required).
Ideally you'd look at doing both (since neither types of trains are in great shape), but I don't know which the bigger priority would be.