Halifaxlad
Established Member
Since Platform 5 at Shipley can't be lengthened. Why not move it towards Bradford on the narrow but wide enough waste land between the line and the adjacent Network Rail yard. So services don't interfere with those heading towards Leeds the existing 3rd line which used to be access into Crossley & Evans yard could be extended Northwards and straight into the existing P5, with a new turnout at the Southern end there would be no-more conflicting services than as at present. Whilst this may impact upon the entry road for this new depot, that could start from further South if needed.

The distance of the shaded box representing a platform is 140m according to Google Maps, long enough for two 3 car 331s. The crossover to the South here would also have to be relocated further South.