• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Amsterdam Eurostar

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,162
Way OT, but the same is planned for Crossrail. Trains departing Maidenhead will have auto announcements in an accent that is 'distinctly home counties'; then when they get to Whitechapel all the announcements will start with "Awight me ol' Chinas, get aaat 'ere for a proper Ruby"
:D:D:D:D:D
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
How long would a London-Amsterdam journey take, assuming they used high speed lines wherever possible?
 

Quakkerillo

Member
Joined
23 Jan 2015
Messages
553
How long would a London-Amsterdam journey take, assuming they used high speed lines wherever possible?

Current London - Brussels journey is approx. 2 hours. Current Thalys Brussels - Amsterdam is 1h50, but with stops in Antwerp and Schiphol. So the overall journey might be 3h45-4h00, depending on how long they make the stops in Brussels/Rotterdam.
 

BahrainLad

Member
Joined
3 Aug 2015
Messages
410
How long would a London-Amsterdam journey take, assuming they used high speed lines wherever possible?

The provisional timetable said 3h50 outbound, 4h6m return (including the 20 minute hold at Brussels whilst the rear half of the train is disembarked, security swept, and boarded.)
 

U-Bahnfreund

Member
Joined
6 Feb 2015
Messages
556
Location
Germany
Concerning the Belgian train announcements, watch this video from Brussel Airport station:
All trains are announced in Dutch (Flemish dialect), French, German and English. Almost 2 minutes for the first train! Also, it's interesting to see which place name they use in which language. In Dutch and French, even if the place is in the other region, the own word for a place is used (e.g. the Flemish town of Aalst is announced in French as Alost), but in German or English, they use the region's main language's name for a place. Even Brussels South station is "Bruxelles Midi" in both languages, and not Brussels South or Brüssel Süd.

Also note the IR train to London Landen.
 

atillathehunn

Established Member
Joined
6 Jan 2010
Messages
1,525
Location
NL
Platforms 22 and 23 at Antwerp that the Thalys uses are already blocked off with temporary metal fencing. Presumably just as a security measure for Thalys passengers, there are no passport or ID checks that I've seen. It's all a bit awkward as domestic services and the International train Brussels-Amsterdam also use those platforms.

They have started half-heartedly fencing off platforms in Liege. But with no real gusto and in about 50% of cases.
 

Gadget88

Member
Joined
23 Aug 2013
Messages
811
Direct service starts next week according to a Twitter post from Euro star!

Thoughts?
 

MisterT

Member
Joined
12 Oct 2014
Messages
451
Location
The Netherlands
Well, that's definitely not true. I think they meant next year.
The preparations in the Netherlands are slowly taking shape, but there is no way it will be ready next week, let alone al the timing/pathing issues it would cause and problems with training, as regular driver training hasn't even started yet. So no, it won't be next week.
 

Gadget88

Member
Joined
23 Aug 2013
Messages
811
That’s the tweet seems even the guy was surprised.
 

Attachments

  • 468ACAE9-DC7D-4335-ABB6-52C049EE0ABE.png
    468ACAE9-DC7D-4335-ABB6-52C049EE0ABE.png
    398.8 KB · Views: 80

Gadget88

Member
Joined
23 Aug 2013
Messages
811
I been following the tweets and they seemed sure a test run will still go ahead in December before 2 trains per day in April 2018.

That’s a tweet to prove that’s the case.
 

Attachments

  • B6191BB2-9D05-4178-8082-6AECC7AF1DB4.png
    B6191BB2-9D05-4178-8082-6AECC7AF1DB4.png
    431 KB · Views: 50

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,791
Location
Cambridge
I been following the tweets and they seemed sure a test run will still go ahead in December before 2 trains per day in April 2018.

That’s a tweet to prove that’s the case.

They don’t make it clear whether a service is a test run or in passenger service!
 

Quakkerillo

Member
Joined
23 Jan 2015
Messages
553
According to this article http://www.treinreiziger.nl/trein-naar-londen-nog-per-december/ (Dutch), the train is currently being tested in the Netherlands to see if the Dutch railway authorities will accept it into service. After that, they're going to do staff training from December, which is when trains will run more regularly, but out of service. From around April, there will be two services per day.

What the article also mentions, is that they claimed earlier to start with 1 train per day, and that they haven't retracted that. Saying they'll run two trains per day in April doesn't mean they can start a with a once daily train earlier, although from what date - if at all remains guesswork. Maybe they'll try to get enough staff trained on this route ASAP from December, and then as soon as that is sorted, and the check-in facilities are ready, start. But if they'll do that, or just wait until the April change, that's going to remain a mystery until the next announcement.
 

33Hz

Member
Joined
2 Dec 2010
Messages
513
As of today there is zero sign of any work at Rotterdam Centraal to build the check in building shown in earlier artist's impressions.
 

GingerSte

Member
Joined
26 May 2010
Messages
292
As of today there is zero sign of any work at Rotterdam Centraal to build the check in building shown in earlier artist's impressions.

Which artists impressions are those? Could you send me a link please?
 

Birkonian

Member
Joined
19 Sep 2017
Messages
290
We have some very weird language laws and regulations here in Belgium. I'm Dutch and still look at many things over here with a 'why' attitude. The only trains where they'll speak French in Flanders, and Dutch in Wallonia are the ICE, Thalys, Eurostar, the Hasselt - Liège/Luik - Maastricht (NL), and the Brussels - Amsterdam train.

On missing out Schiphol and Antwerp; I think these aren't too bad. Schiphol has frequent enough services to Amsterdam, and I'm sure they'll think of some nice inclusive through ticketing for Schiphol to London.
Antwerp on the other hand has got 6 trains per hour to Brussels South-Midi, and people are well using these currently to take the Eurostar. Compared to Rotterdam, Amsterdam, and Lille, I also think that the 'catchment area' of Antwerp would be quite a bit smaller than that of the other places.
And when the train from Lille departs, the on train announcement are done:-

(a) In French only until the train crosses the border
(b) In French and then Dutch from the border until the first stop at Mouscron (in the French speaking part)
(c) In Dutch and then French after the train leaves Mouscron and crosses into the Dutch speaking part of Belgium.

Also on the train from Kortrijk to Ieper, the announcements are in Dutch only until the train arrives at Comines, which is in the French speaking part. After the train leaves Comines, the announcements revert to Dutch only.

A Dutch friend told me that Flemish is a simpler, old fashioned dialect of Dutch. He said it is as if spoken by children. He's biased of course. It is station names that can catch out the unsuspecting traveller. For instance Braine le Comte in French, 's Gravenbakel in Dutch, or Mons and Bergen.
 

Gadget88

Member
Joined
23 Aug 2013
Messages
811
Anybody know anything about this post? It’s in Dutch but some news sites in google today say it’s postponed or delayed anybody confirm what’s going on?
 

Attachments

  • 4B452C0A-FAED-4C0D-BC8F-1FE1E2AF3E26.png
    4B452C0A-FAED-4C0D-BC8F-1FE1E2AF3E26.png
    378.7 KB · Views: 14

Gadget88

Member
Joined
23 Aug 2013
Messages
811
http://www.treinreiziger.nl/eurostar-planning-trein-amsterdam-londen-ongewijzigd/

This article today says it’s on schedule though?

“The introduction of the Eurostar Amsterdam - London is on schedule. That says Eurostar spokesman Evelyne van Cleven in response to news from the Telegraaf.”

“According to De Telegraaf, the introduction has been postponed for six months. The original introduction was planned on December 10, but it has been known for some time that this will not work. Eurostar then stated that the service for Easter 2018 would be introduced. Eurostar now repeats that test runs between Amsterdam and London start on December. The rest of the schedule is also unchanged according to Eurostar. "Earlier this year we said that we are planning to start our commercial connection between Amsterdam / Rotterdam and London in the spring of 2018 and that is still the plan" states Eurostar spokesman Evelyne van Cleven.”
 

MisterT

Member
Joined
12 Oct 2014
Messages
451
Location
The Netherlands
Like the article at treinreiziger.nl said: It is on time to the revised schedule, but it is delayed when looking at the original plans of December 2017. "De Telegraaf" is not known for its factual correctness.
 

Gadget88

Member
Joined
23 Aug 2013
Messages
811
Found this too:


The introduction of the Eurostar high-speed train has been postponed for six months because various safety measures have not yet been approved. The train has to drive in the Netherlands in June 2018.
Eurostar and NS International confirmed this to De Telegraaf.

It is intended that the Eurostar will drive from Amsterdam to London within four hours, with the only stopovers in Rotterdam and Brussels. Passport control is performed at the boarding station, allowing passengers to remain seated.

"We are waiting for safety permission on this route and all passport controls still have to be arranged", according to the NS spokesman in De Telegraaf. In order to be able to carry out the passport controls properly, adjustments must be made to Amsterdam Central and Rotterdam Central stations.

The NS provides the staff and says they are ready for it. According to the railway company, it is still waiting for Eurostar and the Channel Tunnel to be ready to start the test runs. The Eurostar will drive on the high-speed line.”
 

MisterT

Member
Joined
12 Oct 2014
Messages
451
Location
The Netherlands
That's correct. And because there is no space available for the checks at Schiphol Airport and Antwerp, the Eurostar will not call there.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,878
Location
UK
So instead of a 10, 20 or 30 minute delay getting off the train or a security check, passengers now have a delay of six months!
 

Gadget88

Member
Joined
23 Aug 2013
Messages
811
Yes it’s been delayed for years now. I hope now they have the terminals built that this service will be going ahead soon.
 

Groningen

Established Member
Joined
14 Jan 2015
Messages
2,866
First they need to built something on the platforms in Amsterdam and Rotterdam with passportcontrol and those things.
 

withnail2003

New Member
Joined
2 Jun 2016
Messages
4
Location
Amsterdam
Does anybody know the dates for the December test runs? I'm happy to say i live close enough to Amsterdam Centraal that I can see it from my living room window. Would love to take some pics.
 
Status
Not open for further replies.

Top