Altfish
Member
If the old GCR still existed it may have been best used to take freight off the main lines, plus some local services.
If the old GCR still existed it may have been best used to take freight off the main lines, plus some local services.
Sure, if it still existed, it could have taken some freight off the WCML, but it wouldn't be worth re-opening for freight paths and locals.
Currently, there are 4 freight paths an hour on the WCML south of Rugby each way where the GC and WCML meet. I'm quite happy to be creative and suggest we actually have a line to route the freight from the WCML to the GC at Rugby and additionally onto the Dudding Hill route from the North, as well as paths available between Amersham and Rickmansworth. Of those paths, two of those are to Wembley Freightliner Terminal. Those, we can't take off the South WCML. So now, we have 2 tph which, let's say, we can route off the WCML. The only decently sized settlement between Rugby and Aylesbury is Brackley, so an hourly local service would probably do.
Let's say each freight path allows an extra 2 local services on the WCML. For the South WCML, you've now added 2 tph between Rugby and Euston as well as 1 tph between Rugby and Marylebone (we'll just extend the Aylesbury Vale service).
Compare this to taking all 9 tph fast off the WCML, you're not even scratching the surface.
Sure, if it still existed, it could have taken some freight off the WCML, but it wouldn't be worth re-opening for freight paths and locals.
Currently, there are 4 freight paths an hour on the WCML south of Rugby each way where the GC and WCML meet. I'm quite happy to be creative and suggest we actually have a line to route the freight from the WCML to the GC at Rugby and additionally onto the Dudding Hill route from the North, as well as paths available between Amersham and Rickmansworth. Of those paths, two of those are to Wembley Freightliner Terminal. Those, we can't take off the South WCML. So now, we have 2 tph which, let's say, we can route off the WCML. The only decently sized settlement between Rugby and Aylesbury is Brackley, so an hourly local service would probably do.
Let's say each freight path allows an extra 2 local services on the WCML. For the South WCML, you've now added 2 tph between Rugby and Euston as well as 1 tph between Rugby and Marylebone (we'll just extend the Aylesbury Vale service).
Compare this to taking all 9 tph fast off the WCML, you're not even scratching the surface.
It's not just taking 9tph off the WCML but also removing the desire for more long distance services in the future, as the HS2 versions of those trains will be 400m long trains rather than circa 265 long meaning on just a like for like seating capacity (i.e. 2.22 seats per metre of train) the 400m trains would have 888 seats vs 589 which the current 11 coach 390's have (or 50% extra capacity plus whatever extra capacity is provided on the existing line by services using the express train paths).
That is why regardless of what is suggested unless there is a new line the scope for future growth just won't cut it.
Currently, there are 4 freight paths an hour on the WCML south of Rugby each way where the GC and WCML meet.
What does "scope for future growth" actually mean?
I should have been clearer in my previous post regarding the London Extension of the GCR.
I believe that the London Extension was designed with the stations having island platforms and wide road overbridges so as the track could be moved slightly away from the platform edge so as to allow wider trains to run.
Could somebody clarify if that was the case indeed?
Compare this to taking all 9 tph fast off the WCML, you're not even scratching the surface.
You wouldn't if we sorted out Felixstowe to Nuneaton to a proper extent (but that doesn't help you with DIRFT or the planned freight terminals south of Northampton)
Where do you get this nonsense from? There will be plenty of express trains post HS2 - to Rugby, Coventry & Wolverhampton, to Stoke & Macclesfield, to Chester & North Wales and to Trent Valley stations
Of all the services on the WCML, there are those like you list that won't be able to use HS2, but there are those services which don't stop much on the WCML or at least don't stop on the southern end which could switch to HS2 without altering the stations that they serve. It is those that firm the 9 express which will be removed from the WCML. That is not to say that there won't be any edited services left on the WCML.
By my reckoning, 3 to Birmingham (including the one that then goes to Glasgow), 3 to Manchester, 1 to Liverpool, 1 to Glasgow. The 1tph to Chester/North Wales will presumably stay on the WCML (unless the North Wales Coast line is electrified?).
However, some of these will presumably be replaced by stopping services, and indeed the projected service pattern on page 44 and 45 of the 2013 report has 7tph (2 of which are directional peak hours only)
Of all the services on the WCML, there are those like you list that won't be able to use HS2, but there are those services which don't stop much on the WCML or at least don't stop on the southern end which could switch to HS2 without altering the stations that they serve. It is those that firm the 9 express which will be removed from the WCML. That is not to say that there won't be any edited services left on the WCML.
How many times does it have to be pointed out that there is no capacity for them on the Brighton line, which is why they were binned after the XC franchise changes in 2007?
The problems with the Great Central are numerous.
If it hadn't closed down in the first place, then sure, it would have been useful and someone would probably come up with a creative way of terminating the trains in London, and possibly increasing the line speed.
However, as it stands, the alignment barely allows for speeds above 80mph, and you only have two tracks into London for what would be a mixed-traffic line . Currently, Chiltern manage 14 tph into Marylebone in the morning peak, with nigh-on identical stock between Neasden South Junction and Marylebone.
Additionally, how do you deal with the problem the Great Central struggled with for the entirety of its 60 year life-span; how do you get passengers off the Midland, Great Northern and North-Western routes? Other than local services (which might be useful), the expresses just couldn't compete against what were otherwise better alignments.
So why is all the money being invested in a line to Birmingham? I am sure the obvious response is that Birmingham is a contender for the second largest city but how much money could be freed by using slower trains on this route than what have been proposed?
Birmingham IS the 2nd largest city by a mile. There is no other city that comes anywhere near the size of Birmingham on mainland Britain.
Depends on what you call Birmingham - in terms of urban areas, Greater Manchester is slightly larger (population wise) than the West Midlands Urban Area.Birmingham IS the 2nd largest city by a mile. There is no other city that comes anywhere near the size of Birmingham on mainland Britain.
Where do you get this nonsense from? There will be plenty of express trains post HS2 - to Rugby, Coventry & Wolverhampton, to Stoke & Macclesfield, to Chester & North Wales and to Trent Valley stations
When you read comments like that you realise the individual concerned hasn't a clue about the current timetable...
The xx.10, xx.20 and xx.43 departures off Euston stop at Milton Keynes.
The xx.23 stops at Watford Junction
The xx.03 stops at Rugby.
That is 5 out 9 or 4 that could move to HS2 without losing standard hours stops. 4 is considerably less 9....
My daughter has been to the NEC from Manchester today - a routine and regular mainline traffic corridor.
She had to detrain at New St due to overcrowding and only got back on by being allowed into the crew area.
It's not HST fifteen years into the future we need - its a railway fit for purpose now!
The current UK franchise model with companies unable to man up and cater for additional but regular traffic flows will forever fail the travelling public and cause travellers to use the alternatives of motorway and air simply to make journeys because rail is so awful, and anyone who says otherwise is a fool.
Businesses are there to serve the needs of their customers, not their own internal aspirations. Fail in the former and there is no latter anyway, and that is why HS2 is the last thing we need just now.
As I have demonstrated before - there is no need for more than one IC tph to Birmingham from London, and 1, possibly 2tph to Manchester.
No need for any Liverpool trains at all, and no need to any trains going anywhere north of Crewe.
It all adds up rather quickly.
LM can pick up most of the remaining slakc.
When you read comments like that you realise the individual concerned hasn't a clue about the current timetable...
The xx.10, xx.20 and xx.43 departures off Euston stop at Milton Keynes.
The xx.23 stops at Watford Junction
The xx.03 stops at Rugby.
That is 5 out 9 or 4 that could move to HS2 without losing standard hours stops. 4 is considerably less 9....
My daughter has been to the NEC from Manchester today - a routine and regular mainline traffic corridor.
She had to detrain at New St due to overcrowding and only got back on by being allowed into the crew area.
It's not HST fifteen years into the future we need - its a railway fit for purpose now!
The current UK franchise model with companies unable to man up and cater for additional but regular traffic flows will forever fail the travelling public and cause travellers to use the alternatives of motorway and air simply to make journeys because rail is so awful, and anyone who says otherwise is a fool.
Businesses are there to serve the needs of their customers, not their own internal aspirations. Fail in the former and there is no latter anyway, and that is why HS2 is the last thing we need just now.
It is more likely to be the other way round, 2 to Brum 1 to Manchester. There will be a legacy service north of Crewe as well, that won't go.
Birmingham IS the 2nd largest city by a mile. There is no other city that comes anywhere near the size of Birmingham on mainland Britain.
You are assuming that Coventry will be left with LM type services, that wont happen, they will still keep 2 fast-ish trains to London. Not sure how the metro will make any difference.