starrymarkb
Established Member
When you put it like that, GWML electrification has a weak business case. The only justification for it is that the HSTs are getting old, other than that it's weak.
When will politicians/ DFT realise that "sharing electrification round the country" isn't an efficient way of replacing diesel trains with electric ones?
--- old post above --- --- new post below ---
Maybe, but you'd be committing to a 40 year lifespan in either case. What would you replace the HSTs on the GWML with if you don't wire it? 22x derivatives and look at wiring in 2050?
The MML fleet is much younger being mostly 22x plus isn't one of the HS2 forks going to head for Derby/Nottingham and Sheffield eventually?