The depot has a 4 track shed which will NOT be wired,northern will use little shunters to haul electric traction into the shed when electrics turn up.The reason for this is that when ews had it they dewired some off the depot, when northern took over the lease they wanted it exactly the same as before, the shed has never been wired as it was always a diesel depot.
Northern rail are taking delivery of new 350's desiro's and are having some of london midland's, i've been told that the shed is likely to stay un-wired for the foreseeable future,it would cost to much to get 8 section insulators installed and run new wire and sort out feeding each road