• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

All c2c-managed stations in one day

Status
Not open for further replies.

cr767055

Member
Joined
27 Mar 2020
Messages
177
Location
Midlands
Is it possible to visit every c2c-managed station in one (week)day (using any operator/transport mode, but probably c2c :D). Starting and ending at Fenchurch Street, running between, let's say 9am and 7pm?

c2c must be the smallest TOC in terms of area served? Maybe Merseyrail just beats that?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

racyrich

Member
Joined
25 Jan 2014
Messages
234
What do you mean by 'visit'? Get off and not get straight back on the same train? So wait for the next one? Sadly it's all 2 tph now so that's alot of waiting around. Though it's really only the centre bit between Upminster and Pitsea that only gets 2 tph, at the ends you have a mix of mainline and loop trains. I reckon it's doable. The Ockenden line will be a pain.
 

Egg Centric

Established Member
Joined
6 Oct 2018
Messages
2,837
Location
Land of the Prince Bishops
Bit of a game for you all. Is it possible to visit every c2c-managed station in one (week)day (using any operator/transport mode, but probably c2c :D). Starting and ending at Fenchurch Street, running between, let's say 9am and 7pm?

c2c must be the smallest TOC in terms of area served? Maybe Merseyrail just beats that?

I absolutely guarantee I could do it with a motorbike. Probably before 2pm tbh.
 

185143

Established Member
Joined
3 Mar 2013
Messages
5,336
Yes. I've done all but one in a day and travelled to and from Cheshire!

In 2019 admittedly, but still.
 

Egg Centric

Established Member
Joined
6 Oct 2018
Messages
2,837
Location
Land of the Prince Bishops
Yes. I've done all but one in a day and travelled to and from Cheshire!

In 2019 admittedly, but still.

Sounds like you did it by rail - what was the timetable frequency at that time?

It's absolutely trivial by "any transport mode" (I'd like to revise my earlier estimate to say I could very likely do it in 3 1/2 hours* if I just had to touch a part of the station building and no one was asking too many questions about my adherence to speed limits) but interested to see if you could actually do it now on a 30 minute timetable if that is genuinely the case.

But... is that the case? 30 minutes on C2C sounds nuts. Maybe for Purfleet but surely not for most routes?

*I have assumed all have reasonably easy motorcycle access for the purposes of a fleeting touch - may not be accurate
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,292
Location
South West London
Assuming you don’t have to do it in a linear way e.g. going from station A, to B, to C etc., taking advantage of the frequency as best as you can, I’d double back a bit, if your only goal is to visit the stations, as opposed to spending half an hour at each one.
 

185143

Established Member
Joined
3 Mar 2013
Messages
5,336
Sounds like you did it by rail - what was the timetable frequency at that time?

It's absolutely trivial by "any transport mode" (I'd like to revise my earlier estimate to say I could very likely do it in 3 1/2 hours* if I just had to touch a part of the station building and no one was asking too many questions about my adherence to speed limits) but interested to see if you could actually do it now on a 30 minute timetable if that is genuinely the case.

But... is that the case? 30 minutes on C2C sounds nuts. Maybe for Purfleet but surely not for most routes?

*I have assumed all have reasonably easy motorcycle access for the purposes of a fleeting touch - may not be accurate
I did indeed do it by rail.

Fairly sure it was 4tph on the "main" route, certainly as far as Southend Central at least. I did get bowled out by a cancellation somewhere though, possibly Purfleet. Also I was good, mostly, and kept travelling in the same direction.
 

Egg Centric

Established Member
Joined
6 Oct 2018
Messages
2,837
Location
Land of the Prince Bishops
I did indeed do it by rail.

Fairly sure it was 4tph on the "main" route, certainly as far as Southend Central at least. I did get bowled out by a cancellation somewhere though, possibly Purfleet. Also I was good, mostly, and kept travelling in the same direction.
Thanks, that's interesting.

Semi on topic - does your signature also apply to preserved railways?
 

cr767055

Member
Joined
27 Mar 2020
Messages
177
Location
Midlands
What do you mean by 'visit'? Get off and not get straight back on the same train? So wait for the next one? Sadly it's all 2 tph now so that's alot of waiting around. Though it's really only the centre bit between Upminster and Pitsea that only gets 2 tph, at the ends you have a mix of mainline and loop trains. I reckon it's doable. The Ockenden line will be a pain.
Just go through. It would really be a feet to get out at each one and wait for the next service!

Sounds like you did it by rail - what was the timetable frequency at that time?

It's absolutely trivial by "any transport mode" (I'd like to revise my earlier estimate to say I could very likely do it in 3 1/2 hours* if I just had to touch a part of the station building and no one was asking too many questions about my adherence to speed limits) but interested to see if you could actually do it now on a 30 minute timetable if that is genuinely the case.

But... is that the case? 30 minutes on C2C sounds nuts. Maybe for Purfleet but surely not for most routes?

*I have assumed all have reasonably easy motorcycle access for the purposes of a fleeting touch - may not be accurate

The only reason I said any transport mode is just incase the frequency on a certain route is too low, and there's a nearby bus that would fit in better, for example. Or a different TOC.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,725
Location
West of Andover
It might be easier to do it on a Saturday due to more trains running.

Be aware that some stations require you to exit barriers to cross over to the opposite platform (and re-enter).
 
Last edited:

youngiecj

Member
Joined
26 Feb 2012
Messages
415
Had a bit of a bash on C2C on Monday and covered most stations and track. Just a quick question does many services use Ockenden Platform 2?
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,725
Location
West of Andover
Had a bit of a bash on C2C on Monday and covered most stations and track. Just a quick question does many services use Ockenden Platform 2?
Gets used in the peaks when frequency is increased on that single line as trains cross there

From memory the hardest is the centre platform at Laindon as it's only used during the morning peaks. At least the centre platform at Leigh-on-Sea gets at least one terminator during the evening peaks.
 

youngiecj

Member
Joined
26 Feb 2012
Messages
415
Gets used in the peaks when frequency is increased on that single line as trains cross there

From memory the hardest is the centre platform at Laindon as it's only used during the morning peaks. At least the centre platform at Leigh-on-Sea gets at least one terminator during the evening peaks.
That's great information thanks :)
 
Status
Not open for further replies.

Top