From a railway point of view, this is rather disappointing. https://www.gov.uk/government/uploa...266446/airports-commission-interim-report.pdf
The runway options are either at Heathrow or Gatwick, so the ground transport options concentrate on those.
Hence we have essentially a new station at Gatwick, plus better dedicated Gatwick Express stock (turning the clock back).
Doing something about the "East Croydon bottleneck" is mentioned.
Heathrow just mentions new "access from the south", which supposedly means some version of the Airtrack scheme.
Nothing much is said about an HS2 link, or western access, which you would think was vital to Heathrow's health whichever solution is chosen.
The only ambitious statement is that the Liverpool St-Stansted line should be 4-tracked as far as Broxbourne to improve frequency and journey time.
It's not my area but I can't imagine NR and DfT have given this much attention.
Northern Hub is supported in respect of Manchester Airport, but it simply says "do it in full".
Oh and they want paperless ticketing for all airport journeys.
Maybe at this interim stage they have not had much time to think much about rail links, the air issues being so intractable and controversial.
It is to be hoped that the final report in 2015 will give rail proper attention.
Just think, we might then have a public revolt about Heathrow expansion running simultaneously with that for HS2...:cry:
The runway options are either at Heathrow or Gatwick, so the ground transport options concentrate on those.
Hence we have essentially a new station at Gatwick, plus better dedicated Gatwick Express stock (turning the clock back).
Doing something about the "East Croydon bottleneck" is mentioned.
Heathrow just mentions new "access from the south", which supposedly means some version of the Airtrack scheme.
Nothing much is said about an HS2 link, or western access, which you would think was vital to Heathrow's health whichever solution is chosen.
The only ambitious statement is that the Liverpool St-Stansted line should be 4-tracked as far as Broxbourne to improve frequency and journey time.
It's not my area but I can't imagine NR and DfT have given this much attention.
Northern Hub is supported in respect of Manchester Airport, but it simply says "do it in full".
Oh and they want paperless ticketing for all airport journeys.
Maybe at this interim stage they have not had much time to think much about rail links, the air issues being so intractable and controversial.
It is to be hoped that the final report in 2015 will give rail proper attention.
Just think, we might then have a public revolt about Heathrow expansion running simultaneously with that for HS2...:cry:
5.89 Stansted:
●● The Government should work with Network Rail and Transport for London on a
detailed study of the route between London and Stansted Airport and serious
consideration should be given to 4-tracking the line as far as Broxbourne
Junction, subject to a robust business case being developed. This study should
consider how enhancements to the route might benefit airport traffic, London
commuters and Cambridge traffic, recognising that any steps to enhance the
Stansted Express service through regularising or reducing journey times and
improving reliability will help the airport to play an enhanced role in supporting
London and the UK’s international connectivity. The study should take full
account of the Mayor’s London Growth Strategy.
5.89 Gatwick:
The Government and Network Rail should accelerate work to produce a detailed plan for the enhancement of the Brighton Main Line, with a particular emphasis upon enhancing capacity and reliability, so as to accommodate growth in both airport and commuter traffic. This could focus on the alleviation of particular pinch points (such as East Croydon).
5.129 Accordingly, a number of surface transport proposals were identified for further
examination alongside the relevant long-term options ahead of the Commission’s
final report. They include:
●● construction of new high speed rail lines or spurs from current or planned high
speed rail lines, such as the HS2 spur to Heathrow;
●● construction of new rail lines (as opposed to the enhancement of lines that form
part of the existing network); and,
●● significant changes to current infrastructure or service patterns which cannot be
justified on the basis of existing airport traffic levels.
Last edited: