Shrop
Established Member
- Joined
- 6 Aug 2019
- Messages
- 1,350
Having only scanned through this thread I may have missed something, perhaps someone might be kind enough to fill in any gaps if so, and also correct any mistakes in my overall understanding which is as follows.
When HS2 was first proposed it was by Greengauge21 prior to its formal announcement in 2009. They were working with politicians such as Boris Johnson who was then aspiring to become London Mayor, and with ties to the Uxbridge/Heathrow area. He was opposed to a third runway at Heathrow, and the HS2 proposal by Greengauge21 was presented as a major transport development which would remove the need for a third runway, so long as it benefitted Heathrow. This was a major factor in choosing the route heading due west out of London, and having gone that way, this then led to choosing the Chiltern route, with all the problems, objections and extra costs that this brought.
Now we all know that high speed rail doesn’t really benefit from its speed for journeys of less than 200 miles, however Manchester and Leeds are close enough to that distance to not be worth arguing about. The benefits of HS2 were underscored when considering the two-fold arguments, firstly that a new railway was much needed anyway, in order to provide extra capacity to relieve the WCML, and secondly that if you’re going to build a new railway, then the marginal cost of making it high speed means it might as well be just that.
Forward to 2025 and we have a seriously decimated HS2 which won’t be anywhere near 200 miles long, and despite its severely truncated form, it's still several years from completion. Running it directly via Heathrow was discounted many years before construction even started, in favour of just running it somewhere nearby, and linking it to HS1 was similarly discounted many years ago. And yet we now have Heathrow’s third runway actively resurrected to such an extent that it looks highly likely to be built long before HS2 ever reaches either Leeds or Manchester, and possibly before the poor relation of its proper concept even reaches Birmingham.
It's a really sorry indictment of the poor understanding of long term transport needs in the UK, that the very reason for HS2 being routed via West London, ie to avoid the need for a third Heathrow runway, has now not only led to appalling delays and ever spiralling costs, but moreover to HS2 now looking ridiculous in ever more spectacular fashion.
When HS2 was first proposed it was by Greengauge21 prior to its formal announcement in 2009. They were working with politicians such as Boris Johnson who was then aspiring to become London Mayor, and with ties to the Uxbridge/Heathrow area. He was opposed to a third runway at Heathrow, and the HS2 proposal by Greengauge21 was presented as a major transport development which would remove the need for a third runway, so long as it benefitted Heathrow. This was a major factor in choosing the route heading due west out of London, and having gone that way, this then led to choosing the Chiltern route, with all the problems, objections and extra costs that this brought.
Now we all know that high speed rail doesn’t really benefit from its speed for journeys of less than 200 miles, however Manchester and Leeds are close enough to that distance to not be worth arguing about. The benefits of HS2 were underscored when considering the two-fold arguments, firstly that a new railway was much needed anyway, in order to provide extra capacity to relieve the WCML, and secondly that if you’re going to build a new railway, then the marginal cost of making it high speed means it might as well be just that.
Forward to 2025 and we have a seriously decimated HS2 which won’t be anywhere near 200 miles long, and despite its severely truncated form, it's still several years from completion. Running it directly via Heathrow was discounted many years before construction even started, in favour of just running it somewhere nearby, and linking it to HS1 was similarly discounted many years ago. And yet we now have Heathrow’s third runway actively resurrected to such an extent that it looks highly likely to be built long before HS2 ever reaches either Leeds or Manchester, and possibly before the poor relation of its proper concept even reaches Birmingham.
It's a really sorry indictment of the poor understanding of long term transport needs in the UK, that the very reason for HS2 being routed via West London, ie to avoid the need for a third Heathrow runway, has now not only led to appalling delays and ever spiralling costs, but moreover to HS2 now looking ridiculous in ever more spectacular fashion.