I read,on wikipedia I think,that class 320 units maybe used on peak services on the Airdrie to Bathgate route,is this true or just a rumour?
They're not cleared east of Airdrie.
I read,on wikipedia I think,that class 320 units maybe used on peak services on the Airdrie to Bathgate route,is this true or just a rumour?
I caught the 0721 ex Edinburgh service at Glasgow today. 3 coach and totally rammed so I suspect the people that used that service in the past may be wishing the line hadn't opened.
I had a discussion with someone today
"Didn't realise I could get a train to Shettleston, sounds good"
Then I mentioned instead of 4 trains per hour it was just one
"Stuff that, I'll take the car"; and that's what it is currently up against, due to a really basic timetable
I read,on wikipedia I think,that class 320 units maybe used on peak services on the Airdrie to Bathgate route,is this true or just a rumour?
That is usually 6 carriages to be fair. And it really does need the 6 - a 3 carriage train on that service would have been rammed even before Airdrie-Bathgate opened. The only difference will be that more people were left behind somewhere. You'd need to see how it fares as a 6 carriage train to see how much of an effect the line has had.
Once the 4tph are running, quite a lot of passengers will opt for the one before it I think (the current 07:52 limited stop from Airdrie, which will hopefully be run as a 6 car train), and there will be space on it if and only if it's 6 car. Similarly, the 08:22 from Airdrie should be able to cope with the extra as well. Both of these will take a lot of strain off the 07:21 from Edinburgh when things get up and running.
--- old post above --- --- new post below ---
I don't think getting a train (or indeed any other mode of transport) to Shettleston is a good thing
Seriously, though, the SPT area reallyl is spoiled as far as public transport goes. Most routes see a really good turn-up-and-go service. And people expect that. An hourly service is not turn-up-and-go. And that's what's putting them off.
Just about anywhere else, I think a lot of people would make use of the hourly service. But in Greater Glasgow, they're quite simply not going to be impressed by 1tph.
--- old post above --- --- new post below ---
You might be reading that the 320s will be used on peak hour services terminating at Airdrie (and, as such, not going through to Bathgate). In fact, most services terminating at Airdrie will be 320s coming from Balloch.
So once the full timetable is up and running class 320's will be a regular site on Argyle Line duties as well as Airdrie/Springburn duties?
Correct.
I can't remember how many diagrams there will be, but they will operate Ballcoh-Airdrie and Dalmuir-Springburn services. In addition, they will supplement services on the Argyle line (operating alongside 318s). But that's not going to happen for some time. I think they need at least the half hourly A-B timetable before you see any 320s; indeed, it may not happen until the 4tph timetable comes into play.
Can't see the 320's being much good on the Argyle line as they are 75mph units (although the can reach 90mph). This would surely see 318's and spare 334's do the Lanark Runs, with 90mph possible.
So there will be no more class 318 units on North Clyde duties,not even if it's Airdrie/Springburn duties?
Probably what will happen is 2 of the trains will terminate at Partick and reverse at Hyndland, until a turnback is provided closer to Queen Street which will be tricky and costly.
Quite right!One solution would be to put a curve in at the "O2 Academy" near bridge street Underground station, electrify city union line, and run some services into Central!!
The problem with turning back early is that quite a few people do commute from one end of the city to the other, so terminating trains at Charing Cross/Anderston needs to be done carefully so that it doesn't inconvenience people trying to do, say, Larkhall to Anniesland.
Terminating at Partick throughout the day and during the rush hour is actually quite a bad idea. It does nothing to address the congestion issues on the line, and in actual fact will slow things down more because the train needs to cross into the loop at Hyndland. It works in evenings and on Sundays because the timetable is much less intensive, but in the morning rush hour it's a recipe for disaster.
As I understand the proposal :Turning back at Kelvinhaugh would be quite costly, but has been mooted for some time. Indeed, I think it's going to happen for when Cumbernauld services are electrified (so that these services are able to turn back before Partick)
With the exception of one diagram on Springburn duties, 318s aren't currently diagrammed for North Clyde Duties (at least not Monday-Friday). Usually they only come out this way in disruption, and are actually quite a rare occurrence at Airdrie. Once the cascade happens, they'll all be on Argyle Line duties (apart from a handful remaining on Ayrshire and Inverclyde runs). However, I think it's likely that you will still see 318s out in Airdrie when things go wrong for whatever reason.
--- old post above --- --- new post below ---
Turning back at Kelvinhaugh would be quite costly, but has been mooted for some time. Indeed, I think it's going to happen for when Cumbernauld services are electrified (so that these services are able to turn back before Partick). Similarly, improving the existing turnback at Anderston/Exhibition Centre would allow more trains to turn back there.
The problem with turning back early is that quite a few people do commute from one end of the city to the other, so terminating trains at Charing Cross/Anderston needs to be done carefully so that it doesn't inconvenience people trying to do, say, Larkhall to Anniesland.
Terminating at Partick throughout the day and during the rush hour is actually quite a bad idea. It does nothing to address the congestion issues on the line, and in actual fact will slow things down more because the train needs to cross into the loop at Hyndland. It works in evenings and on Sundays because the timetable is much less intensive, but in the morning rush hour it's a recipe for disaster.
The 1645 Glasgow lost 10 minutes tonight because it left Haymarket at the same time as the Bathgate service and got stuck behind it as it stopped at Edinburgh Park (so much for class 1 headcode)
Furthermore, there's nothing to stop 4-tracking from there all the way to Newbridge; there's plenty of room and it would allow more useful overtaking opportunities. You could probably get away with the two tracks from Haymarket-Edinbrugh Park, but the four from Edinburgh Park-Newhouse would be useful.
This morning, I witnessed something rather alarming.
At Blairhill station, the person in front of me in the queue purchased a return to Queen Street, and a return from Queen Street to Edinburgh. When advised that there were now direct trains between Edinburgh and Blairhill, he replied that the new service was "too infrequent to be of any use".
The anytime day return ticket Blairhill-Edinburgh is £17.30. In comparison, his combination cost £24.70. This is a passenger who would rather pay £7.40 more than required, make an unnecessary connection and (probably) extend his journey time than use the new route.
This may well be an isolated incident, but it's really worrying if anyone were to do this. He's deliberately choosing not to use the line because the frequency is not as good as he is used to. If this is widespread, it means that people are avoiding the new line.
That is a bit surprising. It does show how people would rather have a "turn up and go" service (which Blairhall - Glasgow and Glasgow - Edinburgh are) - the debate between "frequent (with one change)" versus "direct" is one we've had several times on here of course (e.g. London - Sunderland), but interesting that even passengers from the A2B line are chosing to travel into/out of central Glasgow.
Hope the frequency of A2B can be sorted out soon, because The Powers That Be will remember it as an example of a bad re-opening, which hampers plans for future re-openings. For example, at the moment people can say "Skipton - Colne is estimated to attract a million passengers a year, and we can probably double that because look how sucessful the Alloa reopening was". In future it might be a case of "Skipton - Colne is estimated to attract a million passengers a year, but we can probably halfe that because look how badly performing the Bathgate reopening was"
The 'Longer' route can take less time. Eg if you miss a weekday service from Bathgate to Glasgow you can get there quicker by going to Haymarket then along the Falkirk line to Glasgow, than by waiting for the next direct service.
Scotrail need to look at how they've messed up here. Haven't they been spending the last 3 1/2 years promising 4 tph on the new line? Why did they not think there would be problems with the class 380 introduction, and that these problems would impact the service pattern on A-B?