helensburgh-waverley, departing hlc at xx:40 and waverley at xx:21.
yes at peak times, 158 services runs to bathgate to provide additional capacity. hourly helensburghs (soon to be half hourly) run in addition to these at peak.
"The next train at platform 1 is the xx:xx service to Edinburgh" resulted in many confused faces at platform 2 at Partick.
The display on the front said Airdrie though.
It's a shame that it's encountered problems; it's a great line and it deserves to do well. It will be a real asset for North Lanarkshire and West Lothian
The trouble (and I don't want to sound overly-pessimistic) is that we are justifying future reopenings by saying "Alloa got more passengers than expected, Ebbw Vale got more passengers than expected..." but one "underperforming" reopening may harm the cause for future ones.
I fear you may be right. The initial passenger numbers for the route, like it or not, will be lower than expected because the line is opening with only 1tph (compared to the anticipated 4tph) and with the intermediate stations out of use. Now, hopefully, by the end of 2011 we shall see the full service and all stations open. But until then, we have to make do with what we've got.
Problem is, the bean counters will probably see this as a failure. If it doesn't meet their expectations, it could definitely put a question mark over the Borders Rail Link in these uncertain times (especially if Labour win the next election and reinstate GARL) and have a significant adverse effect on any future rail reopenings in Scotland - things like a line to St Andrews, extending the Larkhall line, reopening the line to Kilmalcolm, etc
Projects recently have been justified at least in part by claiming that Alloa and Larkhall were big success stories. And indeed they were. In fact, I'm sure this claim was also used to push through the Airdrie-Bathgate project. The problem with this strategy is that even the slightest blip in passenger numbers for whatever reason (either a genuine overestimation, or as in this case issues affecting the service on the new line) will potentially mar future rail projects. To that end, I would hope that the initial passenger numbers are reported in the context of the reduced service.
Having said all this, the M8 completion works due to take place over the next few years will surely push people onto the new line, even if it is only a temporary measure. A significant boost in passenger numbers later on could actually be beneficial for new railway lines.
I agree with all of that.
Look at the way the Cambridge Guided Busway has generated bad publicity for other busways (it'll be a long time before Cambridge is forgotten, even though Ipswich/ Leeds/ Bradford show it can work.
Yes but the difference is that properly thought out rail schemes ie. AtoB but not Edinburgh Tram, are sensible, while Guided Busways are complete nonsense. The great advantage of the bus is it's flexibilty and ability to economically serve smaller passenger flows that rail cant.
Guided infrastructure for Rail transport is neccesary for buses it is not, the driver is perfectly capable of guiding it himself! By all means have bus lanes and even roads reserved for buses but the guided part is about as useful as a fifth leg on a horse.
These guided busways were seen by our useless govt. masters as a cheap way of avoiding spending money on real infrastructure, the bus industry just jumped on the bandwagon even coming up with buses with a bit of fancy skirting which they attempted to pass off as an "alternative" to rail based infrastructure.
However they are not as cheap as they thought and are a poor alternative, the Edinburgh one was falling apart before it was closed for conversion to tramway!