rail-britain
Established Member
- Joined
- 12 Aug 2007
- Messages
- 4,102
Correct, not many extra services, but the timetable was realigned in preparation for it, which meant extending the Motherwell - Cumbernauld service to Stirling was no longer practicalI didn't think the Alloa line meant any additional services on the Glasgow - Croy - Larbert - Stirling route?
However with resignalling as part of EGIP it will be possible