Just wondering if there has ever been any consideration for a new station to serve the 7500 workers at Airbus Broughton in Flintshire. It just seems like a no-brainier to me with the rail line passing the site.
The old station house at Broughton & Bretton (on the Mold branch) still exists - but it's now a veterinary practice.
The link to the main line at Mold Jn has been built upon (by Airbus and others).
The main line passes the end of the runway but is quite a long way from the main factory (the new A380 plant on the other side of the site is nearer).
A new station would only capture a fraction of the traffic to Airbus.
The staff are widely dispersed, mostly in places poorly-sited for the NWML (like the Wirral and inland parts of Flintshire).
The vast Airbus car parks don't encourage public transport commuting, although there is a 10-minute bus service from Chester station past the front entrance to Mold/Deeside.
Many staff work a shift system as well. It's not a 9-5 place.
Manchester-Llandudno commuters wouldn't welcome another stop en route, either.
The local transport plan seems keener on a new station on the Bidston line at Hawarden Bridge to serve Deeside industry (no use to Airbus).