wessexen
Member
I wonder if anyone can answer this for me. As you all know, I've been employed in non-safety critical work (IIRC). Fair enough, I was for one week suppose to do 5 hours a day over 2 shifts (one 06:30 to 08:30 and one 16:30 to 19:30) which I personally don't mind and happy to do it as it doesn't affect my other jobs and for the record, I still do under the 48 hour limits as well, by at least 15 hours.
My new rota was suppose to be in effect from today, but I had a call saying that someone wasn't happy about it. So looking on line, I wanted to have an answer to see if I am doing something wrong or is something else wrong, etc. I've specifically asked for more hours as it is anyway (as I love working on the railways.) So, thoughts and advice would be great. RMT says something different about split shifts than what I am told as it is anyway, which is even more confusing (considering the low hours as well.)
My new rota was suppose to be in effect from today, but I had a call saying that someone wasn't happy about it. So looking on line, I wanted to have an answer to see if I am doing something wrong or is something else wrong, etc. I've specifically asked for more hours as it is anyway (as I love working on the railways.) So, thoughts and advice would be great. RMT says something different about split shifts than what I am told as it is anyway, which is even more confusing (considering the low hours as well.)