This evening I travelled from Kings Cross to Wakefield. Usually a fairly simple 'catch the booked East Coast service'.
This weekend there appeared to be some form of engineering works going on so the suggested route was 'catch the First Capital Connect service to Peterborough and change there for the booked advance East Coast service'.
This was living hell. I travel on 'rush hour' trains every day, this was ten times worse (Ironically, there were ten times more carriages than you would get round where I live!!!).
I was bored on the above mentioned service so did some research and discovered I could have caught the Kings Cross to York service and changed at Peterborough and still made my advance train booking. The other alternative was if alighting at Stevenage on the First Capital Connect train, there would have been an East Coast service to Leeds from there with a 1 hour wait (This however resulting in a time difference between the Stevenage and Peterborough services of about 3 minutes!).
So has anyone experienced this before? Could a valid reason for using an alternative to the advance booked train be engineering works resulting in heavily overcrowded limited service train services?
This weekend there appeared to be some form of engineering works going on so the suggested route was 'catch the First Capital Connect service to Peterborough and change there for the booked advance East Coast service'.
This was living hell. I travel on 'rush hour' trains every day, this was ten times worse (Ironically, there were ten times more carriages than you would get round where I live!!!).
I was bored on the above mentioned service so did some research and discovered I could have caught the Kings Cross to York service and changed at Peterborough and still made my advance train booking. The other alternative was if alighting at Stevenage on the First Capital Connect train, there would have been an East Coast service to Leeds from there with a 1 hour wait (This however resulting in a time difference between the Stevenage and Peterborough services of about 3 minutes!).
So has anyone experienced this before? Could a valid reason for using an alternative to the advance booked train be engineering works resulting in heavily overcrowded limited service train services?