Additional Class 777/1s being considered?

Status
Not open for further replies.

507021

Established Member
Joined
19 Feb 2015
Messages
4,759
Location
Chester
Moved to this section as requested.

I was recently informed by a friend who works for Merseyrail the Liverpool City Region is considering the purchase of long range batteries for three of the Polish-built units (047, 051 and 053) which have yet to be transferred to the UK. As I said in my original post on the subject, this is only being considered at the moment and there's no timescale on when a decision could be made. The reason for additional /1s being considered is not yet known, although at this stage, I'd like to think it would be to create additional resilience for Headbolt Lane services while the fleet settles down. Until reliability of the 777s improves and becomes consistent over a long period, I think it would be extremely unwise to consider further extensions of any length to the Merseyrail network.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WAO

Established Member
Joined
10 Mar 2019
Messages
1,220
A more flexible fleet could be useful, especially for some trial running beyond the system's boundaries. Widnes, yes and perhaps even Shotton?, but not between Headbolt Lane (Low Level) and Headbolt Lane (High Level) for many years.

HX&NY

WAO
 

Northerngirl

Member
Joined
16 Aug 2023
Messages
501
Location
Wirral
I thought the long term plan always was to put batteries in the whole fleet once they are more reliable
 

507021

Established Member
Joined
19 Feb 2015
Messages
4,759
Location
Chester
If it is because another network extension is being considered, then I'd say it's almost certainly Helsby. That said, I'm not sure if ten 777/1s would be sufficient for Helsby and Headbolt Lane with a decent number of spare units as cover.

== Doublepost prevention - post automatically merged: ==

I thought the long term plan always was to put batteries in the whole fleet once they are more reliable

Yes, that is the eventual plan.
 

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
If it is because another network extension is being considered, then I'd say it's almost certainly Helsby. That said, I'm not sure if ten 777/1s would be sufficient for Helsby and Headbolt Lane with a decent number of spare units as cover.

== Doublepost prevention - post automatically merged: ==



Yes, that is the eventual plan.
Extension to Helsby is what Cheshire West & Chester Council are pushing for, but they are not part of Liverpool City Region. The City Region will effectively make the decision, and their top priority for battery extension is to go east from Hunts Cross, because the next few stations are in the City Region.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,297
Extension to Helsby is what Cheshire West & Chester Council are pushing for, but they are not part of Liverpool City Region. The City Region will effectively make the decision, and their top priority for battery extension is to go east from Hunts Cross, because the next few stations are in the City Region.
There may always be a deal to be made with the UK and Welsh Governments for taking on the line to Helsby if it allows operational cuts/savings for Northern and TfW.
 

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
There may always be a deal to be made with the UK and Welsh Governments for taking on the line to Helsby if it allows operational cuts/savings for Northern and TfW.
The savings for Northern are trivial (two return workings per day, usually cancelled) and TfW and the Welsh govt aren't involved with Merseyrail extension to Helsby.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,297
The savings for Northern are trivial (two return workings per day, usually cancelled) and TfW and the Welsh govt aren't involved with Merseyrail extension to Helsby.
TfW would likely be able to shed the Chester-Liverpool Lime Street workings pretty much in their entirety if Helsby can easily be reached via Merseyrail.

That would add up pretty quickly given the dire straits of Welsh public sector finances, they might be willing to pay Merseyrail some portion of the current operating expenses to make it happen.
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
I think they should use some and run some 777s towards Widnes and Warrington.
Better still take over some TPEx trains to the North east instead, and let you have the pleasure of travelling on them along with your Class 555's! :lol:
 

507021

Established Member
Joined
19 Feb 2015
Messages
4,759
Location
Chester
Extension to Helsby is what Cheshire West & Chester Council are pushing for, but they are not part of Liverpool City Region. The City Region will effectively make the decision, and their top priority for battery extension is to go east from Hunts Cross, because the next few stations are in the City Region.

Cost is going to come above priorities where Merseyrail extensions are concerned, and Helsby is by far the cheapest on the table. Also, I don't see where else Merseyrail are going to reach with ten 777/1s in a fleet of 53 units, certainly not Widnes.
 

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
Cost is going to come above priorities where Merseyrail extensions are concerned, and Helsby is by far the cheapest on the table. Also, I don't see where else Merseyrail are going to reach with ten 777/1s in a fleet of 53 units, certainly not Widnes.
It would certainly be a cheap extension, I agree. I don't think there would be any track or signalling changes needed at all. There would be a need to raise platform heights for the level access to the 777s, and I dare say this would raise issues over the lack of step-free access to these stations. However, that's the same for any candidates for extensions.
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
An alternative theory; Merseyrail are replacing their existing fleet with a smaller number of new trains and there was no mention, as far as I'm aware, of enough units being ordered for network expansion. Therefore, potentially fitting a small number of additional units with batteries is either just for a bit of extra fleet flexibility or they have discovered some kind of issue with the battery units and believe a few more might be required to work the Headbolt Lane service reliably. After all, battery fitted units can also work fully electrified routes.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Is there range/capacity to extend the Helsby to somewhere useful like Warrington?
Or extending some of the Chesters to Crewe, replacing the TfW shuttle?
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,601
Location
Croydon
Who in their right mind throws good money after bad ?.

Surely Merseyrail should be sitting on their wallet waiting for the extended teething troubles to get ironed out ?.

Perhaps it is a sweetener from Stadler to add traction batteries free of charge to a few more 777s ?.
But why choose the incompatible half of the fleet ?.

As for adding extra routes. Does this mean Merseyrail ordered too many 777s for the current network ?.
Or have the 777s turned out to be more reliable than anticipated so need to use them on another route !.

BBS - sorry.
 

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
Who in their right mind throws good money after bad ?.

Surely Merseyrail should be sitting on their wallet waiting for the extended teething troubles to get ironed out ?.

Perhaps it is a sweetener from Stadler to add traction batteries free of charge to a few more 777s ?.
But why choose the incompatible half of the fleet ?.

As for adding extra routes. Does this mean Merseyrail ordered too many 777s for the current network ?.
Or have the 777s turned out to be more reliable than anticipated so need to use them on another route !.

BBS - sorry.
The impression I'm gaining from contacts in Liverpool is that the PTE would like to expand Merseyrail and all options mentioned above have been or are being looked at. Of the examples mentioned today, I'd say that extending beyond Helsby to WBQ is highly unlikely. It's not just about the range of the 777s but WBQ is not equipped to terminate/turn round trains from the south, so there would be expensive infrastructure charges. This doesn't apply at Helsby (or Crewe).
 

507021

Established Member
Joined
19 Feb 2015
Messages
4,759
Location
Chester
An alternative theory; Merseyrail are replacing their existing fleet with a smaller number of new trains and there was no mention, as far as I'm aware, of enough units being ordered for network expansion. Therefore, potentially fitting a small number of additional units with batteries is either just for a bit of extra fleet flexibility or they have discovered some kind of issue with the battery units and believe a few more might be required to work the Headbolt Lane service reliably. After all, battery fitted units can also work fully electrified routes.

I am of the view, as I said in the first post, any further expansion to the Merseyrail network would be unwise until the 777s have consistent reliability and having more resilience for Headbolt Lane would be a wise move. However, I'm also trying to be more optimistic they might start working properly in the near future and if this purchase does materialise, there could just be enough slack in the fleet to reach Helsby. That said, I'd actually rather the Liverpool City Region waited until Stadler have got the 777s working properly before they consider giving them any more money.

== Doublepost prevention - post automatically merged: ==

Who in their right mind throws good money after bad ?.

Surely Merseyrail should be sitting on their wallet waiting for the extended teething troubles to get ironed out ?.

Perhaps it is a sweetener from Stadler to add traction batteries free of charge to a few more 777s ?.
But why choose the incompatible half of the fleet ?.

As for adding extra routes. Does this mean Merseyrail ordered too many 777s for the current network ?.
Or have the 777s turned out to be more reliable than anticipated so need to use them on another route !.

BBS - sorry.

I do recall Steve Rotheram saying he was going to seek compensation from Stadler due to the poor performance of the fleet, but haven't heard anything of it since. I'd say slightly too few units were ordered, but with a potential service to Helsby at 2tph needing four units, it may be possible to provide the required extra unit from what they have already if slack is sufficient once the fleet becomes reliable. All hypothetical at this stage, of course.
 
Last edited:

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
Nothing moves fast in the rail industry these days. Looking at business cases and planning any extension to Merseyrail services will take time. It's perfectly sensible IMHO to do this in parallel with solving the early day problems with the 777s. Spending more money with Stadler would be some way off. That said, if Merseyrail are ambitious to extend, they don't really have an alternative to Stadler.
 