I will be travelling past the Poplars Lines on this coming Friday, I am really busy for the rest of Friday and also all day Saturday, so I will post an update this coming Sunday.
Great. Thank you very much. I look forward to it.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

76020

Member
Joined
1 Nov 2012
Messages
198
I found a bit of spare time tonight so here is an update. I travelled on a Paddington to Cardiff train today 15/08/2025, apart from the junction with the North London Line, I had a good view of the Poplars lines. From what I saw all the masts and support arms are in, also there is a single return wire from somewhere around Action West Junction (GWML) to about half way up the incline which goes to Action Main Line Junction (NLL). There is no other wiring at present.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Is this line electrified now? It shows as AC in the Sectional Appendix.
Table GW103-009 States only DM, UM, DR, UR, and ADUL electrified, plus an overrun at Acton West towards Acton Yard, so explicitly not the Poplars on that diagram

Table GW130-001 also does not state that either DP or UP are electrified, which given the GW Sectional Appendix does for electrified lines on every other page I've checked, suggests it is not yet live. Presumably Didcot is noted as the ECR for the AC electrification either because that's the ECR that will be controlling it when electrified, or because on the presence of OLE at Acton Main Line.

I also can't seen any ORR authorisation for placing in service or anything in the PON published on the NR Website about it changing. Could easily have missed something on those though.
 
Last edited:

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,941
Location
London
That sectional appendix table hasn't been updated since April/May. The Weekly Operating Notice (WON) would also list new live electrification sites.
 
Last edited:

The Chimaera

Member
Joined
15 Jun 2018
Messages
94
On my last visit to the Poplars, around two weeks ago the wiring seemed complete except for the connection at Acton West Jn. Though I’m not sure if the other end at Acton Wells was connected either, it was too dark. The contact wire had been installed since my previous trip.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
On my last visit to the Poplars, around two weeks ago the wiring seemed complete except for the connection at Acton West Jn. Though I’m not sure if the other end at Acton Wells was connected either, it was too dark. The contact wire had been installed since my previous trip.
The tie-ins will be the hardest part. I expect there's a lot of less-visible work yet to do, especially with 2 ECRs involved.

According to the September 2025 Edition of the Enhancements Delivery Plan, the Poplars electrification is expected to enter service in July 26
1759305140138.png
For future reference the EDP updates are on this page
 

800301

Member
Joined
29 Dec 2022
Messages
521
Location
Essex
Is this line electrified now? It shows as AC in the Sectional Appendix.

3rd of November it will be live but only the bit on Acton bank to Acton wells Jn, there is a neutral section at the bottom of the hill just before Western Avenue overbridge
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,271
Location
Churn (closed)
I just looked on AIVR.

Last video was 9th September & shows just eastbound / up line as wired up but not connected to the NLL or GWML at either end.

At lot may have happened since then.
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
Awesome, thanks all.

I shall leave it marked as "Under Construction" on the maps.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,941
Location
London
The line is to be considered electrified and live from November 3rd, but as stated this is just the small section of the Up & Down Poplar lines and to the neural section
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,608
Location
Hampshire
Interestingly, and apologies if mentioned in the 99 thread, 99001 did briefly pan up during its test run last week but then continued to depart on diesel. Possible test of the OHLE whilst in the area?

 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
The line is to be considered electrified and live from November 3rd, but as stated this is just the small section of the Up & Down Poplar lines and to the neural section
Weirdly enough, I've been CC'd into an email on my works account stating the structures.
Both lines will be LIVE as far west as structure JW/01/15; the Up Poplar from WG/10/10, the Down Poplar from WG/10/12. This area will be controlled by Rugby ECR; the area to be controlled by Didcot seems to not yet be finished.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
Weirdly enough, I've been CC'd into an email on my works account stating the structures.
Both lines will be LIVE as far west as structure JW/01/15; the Up Poplar from WG/10/10, the Down Poplar from WG/10/12. This area will be controlled by Rugby ECR; the area to be controlled by Didcot seems to not yet be finished.
Is Structure JW/01/15 the location of the neutral section then ?
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
Although currently tagged as under construction. Have I tagged the right sections please?

I'm not sure where those structures are.

1761991157260.png

1761991177219.png
 
Last edited:

mr_moo

Member
Joined
7 Sep 2009
Messages
647
Location
Cambridgeshire
The first section was succesfully energised last night (I'm sat with the project lead today!)
More to come of course but a great start.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
The first section was succesfully energised last night (I'm sat with the project lead today!)
More to come of course but a great start.
Excellent news. I presume this means that for actual services there's basically no change, but certainly better than nothing!
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,586
Location
Nottingham
Excellent news. I presume this means that for actual services there's basically no change, but certainly better than nothing!
There will be another energisation from the neutral section down to the GWML, but these just mean that everyone needs to treat the line as live. A further Entry into Service process needs to be completed before electric trains can actually operate.
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
I'm curious to know where the neutral section has been chosen to be sited as there's quite a climb and freights would not want to be gapped at either end.

WAO
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,586
Location
Nottingham
A neutral section is essential somewhere along the newly wired section, as the wiring each end is fed from completely different places. Trying to make wider changes to put it somewhere else would reduce operational flexibility as well as costing a lot.
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
The neutral section is at the top of the incline.
Does that mean that an electrically hauled East bound freight, with its heavy load still on the rising incline, will lose power when still working hard and running at perhaps 10mph on a curve? I know it's meant for 345 transfers but....

Bring on the batteries.

WAO
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,586
Location
Nottingham
Does that mean that an electrically hauled East bound freight, with its heavy load still on the rising incline, will lose power when still working hard and running at perhaps 10mph on a curve? I know it's meant for 345 transfers but....

Bring on the batteries.

WAO
Electric freight is only a future possibility and as I mentioned above, putting the neutral section somewhere else would have caused problems for no immediate benefit. There are no electrified freight terminals accessible via the electrified part of the GWML, and until that changed any electric freight would have to have a battery or an auxiliary diesel anyway.
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,271
Location
Churn (closed)
Just looked on AIVR. 29/11/2005.

This is now connected at Acton Wells Jc and the crossover on the UP side of Acton Main Line. Theoretically through trains could now operate.
It is not connected on the down side end of Acton ML via the freight sidings as the cables just end before the underpass over junction.
 

Top