My own understanding concerning the double track from Aberdeen North end to the new Junction at Hutcheon street is that many many moons ago when the Denburn St tunnel was singled, the floor collapsed. I understand the Den Burn still runs underneath the floor of the tunnel. So to fix this issue the floor of the tunnel was raised considerably.
That as I understand it is the back story.
Going forwards this tunnel is going to be a point of contention for a few reasons.
As discussed the Scottish Government strategy for electrifying out to Inverurie is well known and has been factored in to the earthworks on A2I upgrades.
However. The feasibility study that was conducted for re-opening the Formartine and Buchan highlighted that for Pathing and an hourly or half hourly service to Ellon and beyond, the Denburn tunnel becomes a serious bottleneck.
The study highlights the cost of this would be borne by the F&B, which is one reason the cost of this project was exaggerated beyond all reasonable proportions to an astronomical £350m even though much of the line is fully intact only being closed and lifted in IIRC 1977.
Then there is the freight loading gauge issue and fitting wires in to a tunnel that never had it considered.
Given its a cut and cover one wonders if its altogether easier to just cut it out altogether.
Then you have Aberdeen City Council in the mix and the less said about them the better.
Someone mentioned Alford, which has recently appeared on a Railscot linked article as a candidate for reopening along with Deeside. Add that in to the mix and the pathing at the North End of Aberdeen station demands drastic changes in the layout. Re opening 8&9 in the Joint wont cut it.
Anyway, back on topic. The A2I upgrade is a fantastic improvement, no more waiting at Dyce for the Northbound, and has made the jouney considerably smoother. Then then there is Kintore which is very welcome.