Just been looking at Traksy for some research for the Valley lines, and saw a second platform at Aberdare that said "from 2024". It looks to be on a loop south of the station (see below), and there seems to be no mention of this on Wikipedia.

I had a look on RealTime Trains, however although it exists as a location, nothing is scheduled to serve it, even from a look at as far away as November.

I just wondered if platform 1 will still be served and the use of such a platform just down from another that currently seems to be sufficient?

Thanks for any help regarding this!
 

Attachments

  • Screenshot_20240601_202702_com.android.chrome.jpg
    Screenshot_20240601_202702_com.android.chrome.jpg
    200 KB · Views: 200
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,745
Location
West of Andover
When the line goes up to 4 trams per hour, Platform 2 will be used to terminate a tram with platform 1 used as the departure platform with the trams doing an ECS shunt from P2 to P1.
 

Trainguy34

Established Member
Joined
29 Apr 2023
Messages
1,230
Location
Kent
When the line goes up to 4 trams per hour, Platform 2 will be used to terminate a tram with platform 1 used as the departure platform with the trams doing an ECS shunt from P2 to P1.
Ah, thanks. When will this roughly be?
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,094
As far as I’m aware both have been kicked into the long grass.

It was a dynamic loop mid way, not full double track I think.
I thought it was from immediately beyond Dingle Rd to just short of Penarth (so no second platform was planned at Dingle Rd). I recall seeing that clearance work had started, so that’s a very late change to pull the work.
 

Signal_Box

Member
Joined
25 Dec 2021
Messages
739
Location
UK
I thought it was from immediately beyond Dingle Rd to just short of Penarth (so no second platform was planned at Dingle Rd). I recall seeing that clearance work had started, so that’s a very late change to pull the work.

A dynamic loop yes, how dynamic it would of been is a good question.
 