Is my memory faulty, or did it used to be double track from Sutton Bridge to that PW yard at Hookagate? Wouldn't a short double track section here be useful both in terms of making a nominal reduction in the length of the single line section, and providing a location for an Aber bound train to await a late running Shrewsbury bound train while not blocking up Shrewsbury station or the main North and West line?[/QUOTE]
Statistically the initial delays are predominantly in the West Midlands, though as many point out the reduced infrastructure in Wales then cant allow any recovery. ATW currently arrive at New St @ xx26 wait 12 mins and go to INTL (with recovery time!) arriving xx50, the return is at XX09 departing New St xx24. In effect a 35 min layover so in practice nearly all the time the Westbound departures are right time out of New St. ATW also share the ORCATS cake from New St to INTL as well! Arriva in its never do anything unless someone else pays mode.
Sutton Bridge Jnc to Cruckmeole Jnc (Pontesbury branch) was double track
Passing loops at Yockleton and Westbury
Buttington Jnc to Forden was double track
Passing loops at Montgomery and Abermule
Newtown to Moat Lane Jnc was double track
Passing loops at Caersws, Pontdolgoch, Carno, Talerddig, Llanbrrynmair, Cemmaes Rd, Machynlleth, Dovey Jnc, Glandyfi, Ynyslas, Borth, Landre and Bow St
Llanbadarn Fawr to Aberystwyth was double track.
BR singled the route and closed many village stations in 65 and introduced DMU's as per the recommendation of the Beeching report.
Passing loops were initially kept at Borth, Dovey Jnc, Machynlleth, Cemmaes Rd, Talerddig, Caersws, Newtown, Montgomery, Welshpool and Westbury. Hookagate to Sutton Bridge was double track.